Forged Solutions Group Dale Road North Darley Dale Derbyshire DE4 2JB Data via plota.co.uk

T/26/00131/TPO - Tree Preservation Order Approved

Proposal

Epicormic growth removal on 11no lime tree and 2no. copper beech tree Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Aug 2026
✓
Consultation
3 Aug 2026
✓
Approved
14 Sept 2026

Approved on 14 Sept 2026 · Last checked 14 Sept 2026

Site constraints 5

Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
National park about 312 m away: Peak District; Inside the Darley Dale built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Derbyshire Dales - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Preservation Order
Postcode
DE4 2JB
Received
3 Aug 2026
Validated
3 Aug 2026
Ward
Darley Dale
Parish
Northwood And Tinkersley
Case officer
Show
Target decision
28 Sept 2026
Decision
Granted with Conditions
Decision date
14 Sept 2026
Applicant
Show
Agent
Forged Solutions

How this decision compares

Decided in 42 days from validation, 11 days slower than Derbyshire Dales's median of 31 for tree and landscaping works. Approved, as 97% of tree and landscaping works here are.

100%decided within 8 weeks
97%approved
146decided in the last year

Plota live figures for tree and landscaping works decided by Derbyshire Dales in the last twelve months, from validation. Derbyshire Dales decision record →

Public comments

No public comments yet.

Last counted 14 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15124021
Planning Portal ref
PP-15124021
Consultation
3 Aug 2026
Comments by
24 Aug 2026
Statutory expiry
28 Sept 2026
Env. assessment
No
Derbyshire Dales
Planning Authority Score
5.8/10
Average
#110 of 296 councils
Relevant to this application:
Householder decisions

Derbyshire Dales ranks #121 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Derbyshire Dales decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #129 of 296
93%
Householder approved
Above avg (90%) #127 of 296
70%
Decided in 8 weeks
Above avg (63%) #121 of 296
38%
Extended time limit
Below avg (41%) #127 of 296
81%
Minor dwellings approved
85 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
100%
Change of use approved
4 decided
486
Total decisions
52 refused in the year to March 2026