8 Marina View Mill Road Buckden St Neots PE19 5QS Data via plota.co.uk

26/01415/FUL - Full Planning Application In progress

Proposal

Construction of a raised timber deck extension adjoining the existing raised deck and walkway at Lodge 8 Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
4 Aug 2026
Validated
26 Aug 2026
Consultation
27 Aug 2026
Decision
Expected by 21 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 21 Oct 2026, from Huntingdonshire's recent extensions. Comments are open until 18 Sept 2026.

Comment on this application ↗

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Tree preservation order
Consent is needed before work on protected trees.
Not every council has published its orders as open data, so no order shown is not proof there is none.
Habitat network: Restorable Habitat
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Public footpath 29 m away; the 1970s provisional farmland map had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Huntingdonshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
PE19 5QS
Received
4 Aug 2026
Validated
26 Aug 2026
Ward
Buckden
Parish
Buckden
Case officer
Show
Applicant
Show

Decision outlook

Day 18 of the 56-day target. Huntingdonshire usually decides extensions by day 56.

Day 1838 days to the 56-day target
54%decided within 8 weeks
91%approved
354decided in the last year

Plota live figures for extensions decided by Huntingdonshire in the last twelve months, from validation. Huntingdonshire decision record →

Public comments

No public comments yet.

8 neighbours consulted · Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15075309
Neighbours
27 Aug 2026
Consultation
27 Aug 2026
Comments by
18 Sept 2026
Env. assessment
No
Huntingdonshire
Planning Authority Score
3.9/10
Below average
#197 of 296 councils
Relevant to this application:
Householder decisions

Huntingdonshire is slower than most councils at deciding householder applications, ranking #210 out of 296. 55% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Huntingdonshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #155 of 296
95%
Householder approved
Above avg (90%) #80 of 296
55%
Decided in 8 weeks
Below avg (63%) #210 of 296
55%
Extended time limit
Above avg (41%) #250 of 296
69%
Minor dwellings approved
175 decided (1-9 homes)
91%
Major dwellings approved
22 decided (10+ homes)
87%
Change of use approved
52 decided
1,077
Total decisions
125 refused in the year to March 2026