4-5 Baxtergate Whitby North Yorkshire YO21 1BW Data via plota.co.uk

Proposal

Conversion including internal and external alteration and extension to existing building to form bar with food provision (sui generis) on first floor and associated staff welfare on second floor. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Jul 2026
✓
Validated
1 Sept 2026
✓
Consultation
9 Sept 2026
Decision
Target date was 27 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 5 Nov 2026 and 25 Nov 2026, from Scarborough's recent changes of use.

The consultation period closed on 12 Oct 2026.

Licence at this address

  • Licence Treasury Premises licence · in force since 24 Dec 2025 Licensed hours: alcohol until 22:30 (Fri-Sat 02:30)
    Food hygiene rating: 5 (Very good)Inspected 25 Jun 2026

Licensed hours are what the licence permits, not opening times.

Site constraints 10

Grade II listed: Hsbc Bank (Including Harbour View Cafe)
List entry 1393942 · 4 m away · 78 more listed buildings within 150 m (1 Grade I, 3 Grade II*, 74 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 78 with distances
Historic England ↗
Whitby conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers and the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Also on the record
Radon affected area, class 2; Scheduled monument 224 m away: Whitby Abbey: Saxon double-house, post-Conquest Benedictine monastery, C17 manor house and C14 cross.; Flood defence 24 m away (natural high ground); SSSI 492 m away: Whitby-Saltwick SSSI; Inside the Whitby built-up area; Priority habitat 30 m away: Mudflats; Heritage coast 224 m away: North Yorkshire & Cleveland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area445 m² (4,790 sq ft)
Energy ratingD (asset rating 88)
UseRetail/Financial and Professional Services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in June 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Scarborough - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building consent
Postcode
YO21 1BW
Received
22 Jul 2026
Validated
1 Sept 2026
Ward
Whitby Streonshalh
Parish
Whitby (Scarborough)
Case officer
Show
Target decision
27 Oct 2026
Decision level
Chief Planner
Applicant
Show
Agent
CLB Heritage

Decision outlook

Day 59 of the 56-day target. Scarborough usually decides changes of use by day 75.

Day 5916 days to the predicted decision (day 75)
33%decided within 8 weeks
88%approved
50%go to committee

Plota live figures for changes of use decided by Scarborough in the last twelve months, from validation. Scarborough decision record →

Public comments

1comment received
1 supporting

Last counted 29 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15099238
Planning Portal ref
PP-15099238
Consultation
9 Sept 2026
Comments by
12 Oct 2026
Site or press notice
18 Sept 2026
Statutory expiry
27 Oct 2026
Env. assessment
No

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.