Land off, Roslyn Avenue, Netherton, Huddersfield, HD4 7EW Data via plota.co.uk

Application undecided 2026/91615
Date received
11 Jun 2026
Date validated
11 Jun 2026
Postcode
HD4 7EW

Description

Discharge of details reserved by Conditions 14 (Phasing Plan), 15 (Construction Ecological Management Plan (CEMP)), 16 (Construction Environmental Management Plan: Biodiversity), 17 (Phase 2 Investigation), 18 (Remediation Strategy), 19 (unexpected contamination), 20 (verification), 21 (Surface water drainage scheme), 22 (Flood routeing), 23 (temporary surface water), 24 (Arboricultural method statement), 25 (road condition survey), 26 (highway structures), 27 (retaining wall spec), 28 (Written Scheme of Archaeological Investigation (WSI)), 29 (Ecological Design Strategy (EDS)), 30 (PROW HUD/228/10 improvement spec), 31 (road, footway, and footpath spec), 32 (site access spec), 33 (internal estate streets spec), 34 (Local Equipped Area of Play (LEAP) spec), 35 (Travel Plan), 36 (Cycle store details), 37 (ancient woodland information boards spec), and 38 (ancient woodland information packs spec) on previous permission 2025/91870 for variation of conditions 5 (plans and specifications), 29 (Ecological Design Strategy), 32 (site access works and road marking improvements), 33 (internal estate streets scheme), 34 (play area), 37 (information boards), 39 (vehicle parking areas surface and drainage), 41 (bin storage area and waste collection point) on previous outline permission 2023/93503 for residential development of 82 dwellings and associated works, with layout and access as considerations. Data via plota.co.uk

Kirklees
Planning Authority Score
2.7/10
Poor
#243 of 292 councils
Relevant to this application:
Major dwellings

Kirklees is slower than most councils at deciding householder applications, ranking #243 out of 292. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Kirklees decision performance
Based on MHCLG data, 2025
92%
Overall approval rate
Above avg (87%) #84 of 292
93%
Householder approved
Above avg (90%) #130 of 292
47%
Decided in 8 weeks
Below avg (64%) #243 of 292
60%
Extended time limit
Above avg (40%) #266 of 292
85%
Minor dwellings approved
228 decided (1-9 homes)
90%
Major dwellings approved
39 decided (10+ homes)
85%
Change of use approved
55 decided
1,719
Total decisions
145 refused in 2025