59 Pegwell Road, Ramsgate, Kent, CT11 0NJ Data via plota.co.uk

FH/TH/26/0860 - Householder Application Approved

Proposal

Alterations to external materials and finishes, together with replacement uPVC windows and doors Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Aug 2026
✓
Validated
24 Aug 2026
✓
Approved
15 Oct 2026

Approved on 15 Oct 2026 · Delegated decision · Last checked 19 Oct 2026

Site constraints 11

7 listed buildings within 150 m
Nearest: 65 and 67, Pegwell Road, Grade II, 26 m away · 7 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 7 with distances
Historic England ↗
Pegwell Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Article 4 direction
Ramsgate ED. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Public footpath 13 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Special area of conservation 79 m away: Thanet Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Folkestone to Ramsgate 14 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
National infrastructure project 322 m away: Thanet Extension Offshore Wind Farm
The site is 322 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Sea Link (awaiting the Secretary of State's decision, 634 m); Manston Airport (decided, 1053 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
SSSI 79 m away: Sandwich Bay to Hacklinge Marshes SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Tree preservation order 18 m away; Inside the Ramsgate built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Thanet - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Thanet
Application type
Householder Application
Postcode
CT11 0NJ
Received
20 Aug 2026
Validated
24 Aug 2026
Ward
Cliffsend And Pegwell
Parish
Ramsgate Civil Parish
Case officer
Show
Target decision
19 Oct 2026
Decision
Grant Permission
Decision date
15 Oct 2026
Decision level
Delegated decision
Applicant
Show
Agent
Planning by Design

How this decision compares

Decided in 52 days from validation, 4 days faster than Thanet's median of 56 for extensions. Approved, as 93% of extensions here are.

61%decided within 8 weeks
93%approved
5%go to committee

Plota live figures for extensions decided by Thanet in the last twelve months, from validation. Thanet decision record →

Consultation & key dates

Statutory expiry
19 Oct 2026
Thanet
Planning Authority Score
4.5/10
Below average
#175 of 296 councils
Relevant to this application:
Householder decisions

Thanet ranks #171 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Thanet decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #103 of 296
94%
Householder approved
Above avg (90%) #122 of 296
62%
Decided in 8 weeks
Below avg (63%) #171 of 296
45%
Extended time limit
Above avg (41%) #196 of 296
79%
Minor dwellings approved
105 decided (1-9 homes)
85%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
50 decided
751
Total decisions
67 refused in the year to March 2026