25/06412/FULL - Full Planning Permission Application Pending

Proposal

Use as building as a single family dwellinghouse (Class C3). External alterations including the installation of replacement windows and doors. Installation of garage doors in place of to two windows on the Mansfield Mews frontage, installation of replacement roof lights, removal of roof lights at main roof level, removal of cantilevered outrigger WC at rear first floor level, alterations to fenestration of the mews portion of the building facing the internal courtyard to mews portion of building. Reconstruct part of brick parapet, installation of plant at main roof level . [SITE INCLUDES 6 MANSFIELD MEWS] Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2025
✓
Validated
25 Sept 2025
✓
Consultation
30 Sept 2025
Decision
Target date was 20 Nov 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 6 Nov 2026; it is now day 407.

The consultation period closed on 29 Oct 2025.

Documents 156

Plans & drawings 115

PDF THIRD FLOOR FIRE ALARM LAYOUT Drawing · 8 Sept 2025 View ↗ PDF MANSFIELD HOLDINGS Drawing · 8 Sept 2025 View ↗ PDF LOWER GROUND FLOOR FIRE ALARM LAYOUT Drawing · 8 Sept 2025 View ↗ PDF FIRST FLOOR FIRE ALARM LAYOUT Drawing · 8 Sept 2025 View ↗ PDF SECOND FLOOR FIRE ALARM LAYOUT Drawing · 8 Sept 2025 View ↗ PDF LOWER GROUND FLOOR MECHANICAL SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF ROOF LEVEL MECHANICAL SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF FIRST FLOOR MECHANICAL SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF SECOND FLOOR MECHANICAL SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF THIRD FLOOR MECHANICAL SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF GROUND FLOOR MECHANICAL SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF THIRD FLOOR PUBLIC HEALTH SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF GROUND FLOOR PUBLIC HEALTH SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF LOWER GROUND FLOOR PUBLIC HEALTH SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF ROOF LEVEL PUBLIC HEALTH SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF FIRST FLOOR PUBLIC HEALTH SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF SECOND FLOOR PUBLIC HEALTH SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF THIRD FLOOR SPRINKLER SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF GROUND FLOOR SPRINKLER SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF LOWER GROUND FLOOR SPRINKLER SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF FIRST FLOOR PUBLIC HEALTH SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF SECOND FLOOR SPRINKLER SERVICES LAYOUT Drawing · 8 Sept 2025 View ↗ PDF BLOCK PLAN Drawing · 8 Sept 2025 View ↗ PDF LOCATION PLAN Location Plan · 8 Sept 2025 View ↗ PDF EXTG RF PLAN Drawing · 8 Sept 2025 View ↗ PDF EXTG LG PLAN Drawing · 8 Sept 2025 View ↗ PDF EXTG VAULTS Drawing · 8 Sept 2025 View ↗ PDF GROUND FLOOR PLANS AS EXISTING (POST STRIP-OUT) Drawing · 8 Sept 2025 View ↗ PDF EXTG 1ST PLAN Drawing · 8 Sept 2025 View ↗ PDF EXTG 2ND PLAN Drawing · 8 Sept 2025 View ↗ PDF EXTG 3RD PLAN Drawing · 8 Sept 2025 View ↗ PDF EXTG E3 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF EXTG E4 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF EXTG E5 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF 1 EXTG E1 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF EXTG E2 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF PROP INT ELEV Drawing · 8 Sept 2025 View ↗ PDF PROP INT ELEV Drawing · 8 Sept 2025 View ↗ PDF PROP INT ELEV Drawing · 8 Sept 2025 View ↗ PDF R.1.03 - DRAWING ROOM INTERIOR ELEVATIONS AS PROPOSED Other · 8 Sept 2025 View ↗ PDF PROP INT ELEV R107 Drawing · 8 Sept 2025 View ↗ PDF PROP INT ELEV Drawing · 8 Sept 2025 View ↗ PDF PROP INT ELEV Drawing · 8 Sept 2025 View ↗ PDF PROP INT ELEV Drawing · 8 Sept 2025 View ↗ PDF PROP INT ELEV Drawing · 8 Sept 2025 View ↗ PDF PROP INT ELEV Drawing · 8 Sept 2025 View ↗ PDF PROP INT ELEV Drawing · 8 Sept 2025 View ↗ PDF PROP INT ELEV Drawing · 8 Sept 2025 View ↗ PDF PROP INT ELEV RG03 Drawing · 8 Sept 2025 View ↗ PDF DEMO 2ND RCP Drawing · 8 Sept 2025 View ↗ PDF DEMO 3RD RCP Drawing · 8 Sept 2025 View ↗ PDF DEMO LG RCP Drawing · 8 Sept 2025 View ↗ PDF DEMO GF RCP Drawing · 8 Sept 2025 View ↗ PDF DEMO 1ST RCP Drawing · 8 Sept 2025 View ↗ PDF PROP 2ND RCP Drawing · 8 Sept 2025 View ↗ PDF PROP 3RD RCP Drawing · 8 Sept 2025 View ↗ PDF PROP LG RCP Drawing · 8 Sept 2025 View ↗ PDF PROP GF RCP Drawing · 8 Sept 2025 View ↗ PDF PROP 1ST RCP Drawing · 8 Sept 2025 View ↗ PDF DEMO E4 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF DEMO E5 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF DEMO E1 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF DEMO E2 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF DEMO E3 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF DEMO 2ND PLAN Drawing · 8 Sept 2025 View ↗ PDF DEMO 3RD PLAN Drawing · 8 Sept 2025 View ↗ PDF DEMO RF PLAN Drawing · 8 Sept 2025 View ↗ PDF DEMO LG PLAN Drawing · 8 Sept 2025 View ↗ PDF DEMO VAULTS Drawing · 8 Sept 2025 View ↗ PDF DEMO GF PLAN Drawing · 8 Sept 2025 View ↗ PDF DEMO 1ST PLAN Drawing · 8 Sept 2025 View ↗ PDF DEMO INT ELEV Drawing · 8 Sept 2025 View ↗ PDF DEMO INT ELEV Drawing · 8 Sept 2025 View ↗ PDF DEMO INT ELEV Drawing · 8 Sept 2025 View ↗ PDF DEMO INT ELEV Drawing · 8 Sept 2025 View ↗ PDF DEMO INT ELEV Drawing · 8 Sept 2025 View ↗ PDF DEMO INT ELEV Drawing · 8 Sept 2025 View ↗ PDF DEMO INT ELEV Drawing · 8 Sept 2025 View ↗ PDF DEMO INT ELEV RG02-2 Drawing · 8 Sept 2025 View ↗ PDF INTERMEDIATE FLOORS FLOOR & ROOF BUILD-UPS Drawing · 8 Sept 2025 View ↗ PDF ROOF BLD UP Drawing · 8 Sept 2025 View ↗ PDF LOWER-GROUND FLOOR FLOOR & ROOF BUILD-UPS Drawing · 8 Sept 2025 View ↗ PDF FLR FINSH 3RD PLAN Drawing · 8 Sept 2025 View ↗ PDF FLR FINSH LG PLAN Drawing · 8 Sept 2025 View ↗ PDF FLR FINSH VAULT PLAN Drawing · 8 Sept 2025 View ↗ PDF FLR FINSH GF PLAN Drawing · 8 Sept 2025 View ↗ PDF FLR FINSH 1ST PLAN Drawing · 8 Sept 2025 View ↗ PDF FLR FINSH 2ND PLAN Drawing · 8 Sept 2025 View ↗ PDF JOINERY FCU CVR Drawing · 8 Sept 2025 View ↗ PDF JOINERY WRDBE Drawing · 8 Sept 2025 View ↗ PDF PROP 1ST PLAN Drawing · 8 Sept 2025 View ↗ PDF PROP 2ND PLAN Drawing · 8 Sept 2025 View ↗ PDF PROP 3RD PLAN Drawing · 8 Sept 2025 View ↗ PDF PROP RF PLAN Drawing · 8 Sept 2025 View ↗ PDF PROP LG PLAN Drawing · 8 Sept 2025 View ↗ PDF PROP VAULTS Drawing · 8 Sept 2025 View ↗ PDF PROP GF PLAN Drawing · 8 Sept 2025 View ↗ PDF PROP E3 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF PROP E4 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF PROP E5 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF PROP E1 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF PROP E2 ELEVATION Drawing · 8 Sept 2025 View ↗ PDF WATERPROOFING DETAIL D2 D3 WATERPROOFING STRATEGY Drawing · 8 Sept 2025 View ↗ PDF WTRPRFNG LG PLAN Drawing · 8 Sept 2025 View ↗ PDF WTRPRFNG VAULT PLAN Drawing · 8 Sept 2025 View ↗ PDF WATERPROOFING DETAIL D1 WATERPROOFING STRATEGY D1 Drawing · 8 Sept 2025 View ↗ PDF WIN DETAIL PROP Drawing · 8 Sept 2025 View ↗ PDF WIN DETAIL DRMR Drawing · 8 Sept 2025 View ↗ PDF TYPICAL REPLACEMENT SASH TYPICAL WINDOW DETAILS Drawing · 8 Sept 2025 View ↗ PDF INT DOOR TYPE 04 Drawing · 8 Sept 2025 View ↗ PDF INT DOOR TYPE 05 Drawing · 8 Sept 2025 View ↗ PDF INT DOOR TYPE 06 Drawing · 8 Sept 2025 View ↗ PDF INT DOOR TYPE 01 Drawing · 8 Sept 2025 View ↗ PDF INT DOOR TYPE 02 Drawing · 8 Sept 2025 View ↗ PDF INT DOOR TYPE 03 Drawing · 8 Sept 2025 View ↗

Other documents 25

PDF HISTORIC ENGLAND Other · 20 Oct 2025 View ↗ PDF HISTORIC ENGLAND Other · 16 Oct 2025 View ↗ PDF ACK-GENERAL LETTER (G/P/C) Background Papers · 30 Sept 2025 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 30 Sept 2025 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 30 Sept 2025 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 30 Sept 2025 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 30 Sept 2025 View ↗ PDF SITE NOTICE 21 OR 28 DAYS IF T&C APPL. Background Papers · 30 Sept 2025 View ↗ PDF 1ST INVALID LETTER Background Papers · 25 Sept 2025 View ↗ PDF RECEIPT OF APPLICATION Other · 16 Sept 2025 View ↗ PDF ATTACHMENT SUMMARY Background Papers · 8 Sept 2025 View ↗ PDF DESK BASED ARCHAEOLOGICAL REPORT Report · 8 Sept 2025 View ↗ PDF 9 MANSFIELD STREET - PART L SAP REPORT Other · 8 Sept 2025 View ↗ PDF INTERIOR FINISHES CONCEPT Background Papers · 8 Sept 2025 View ↗ PDF 9 MANSFIELD STREET REPORT FINAL Other · 8 Sept 2025 View ↗ PDF MANSFIELD STREET COVERING LETTER Background Papers · 8 Sept 2025 View ↗ PDF PLANNING RESIDENTIAL-STUDY Background Papers · 8 Sept 2025 View ↗ PDF REPORT ON THE CHIMNEY PIECES 9 MANSFIELD STREET NOVEMBER 2024 (1) Background Papers · 8 Sept 2025 View ↗ PDF EXTG DOOR SCH - COMBINED OPT Other · 8 Sept 2025 View ↗ PDF EXTG WIN SCH - COMBINED OPT Other · 8 Sept 2025 View ↗ PDF PROP WIN SCH - COMBINED Other · 8 Sept 2025 View ↗ PDF DWNG REG PLANNING (1) Background Papers · 8 Sept 2025 View ↗ PDF 9 MANSFIELD STREET REPLACEMENT TEXT 4 4 25 Background Papers · 8 Sept 2025 View ↗ PDF ACS 9 MANSFIELD STREET STAIRCASE SCHEME REPORT Background Papers · 8 Sept 2025 View ↗ PDF 9 MANSFIELD STREET FVA FULL Other · 8 Sept 2025 View ↗

All documents on the council site ↗

Site constraints 9

Grade II* listed: 5-13, Mansfield Street W1
List entry 1273679 · The pin is inside its outline · 61 more listed buildings within 150 m (1 Grade I, 14 Grade II*, 45 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 61 with distances
Historic England ↗
Harley Street conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Article 4 Basement Development Permitted Rights Removed. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: City of Westminster APA 2.5
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
National infrastructure project 1811 m away: Thames Tideway Tunnel; Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,015 m² (10,925 sq ft)
Energy ratingE (asset rating 102)
UseOffices and Workshop Businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in January 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Postcode
W1G 9NZ
Received
8 Sept 2025
Validated
25 Sept 2025
Ward
Marylebone
Case officer
Show
Target decision
20 Nov 2025
Agent
Newmark

Decision outlook

Day 407, past the statutory target. 58% of full applications in Westminster are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 31 Oct 2026.

Day 407351 days past the 56-day target
35%decided within 8 weeks
86%approved
2,198decided in the last year

Plota live figures for full applications decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

1comment received
1 supporting

74 neighbours consulted · Last counted 31 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14264525
Planning Portal ref
PP-14264525
Comments by
29 Oct 2025
Site or press notice
30 Sept 2025
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.