The Highlightthe Waterfronthartlepoolts24 0XN Data via plota.co.uk

D/2026/0041 - Discharge of condition Pending

Proposal

Discharge of conditions 11 (secure cycle parking, seating and public realm), 12 (ventilation) and 14 (electric vehicle charging apparatus) of planning permission (Erection of leisure and community building including swimming pools, fitness suites, studios, cafe and ancillary spaces. External landscaping including public events space, car parking, vehicle drop off/collection and infrastructure improvements) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Aug 2026
✓
Validated
27 Aug 2026
Decision
Target date was 21 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 21 Oct 2026.

Associated applications 2

  • Part of

    Fullcouncil archive

    Conditions details submitted for 11, 12, 14

    • ConditionsDischarge of conditions 11 (secure cycle parking, seating and public realm), 12 (ventilation)…This applicationD/2026/0041

Site constraints 6

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area about 45 m away: Teesmouth and Cleveland Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Radon affected area, class 2; SSSI about 414 m away: Teesmouth and Cleveland Coast SSSI; Inside the Hartlepool built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hartlepool - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hartlepool
Application type
Discharge of condition
Postcode
TS24 0XN
Received
20 Aug 2026
Validated
27 Aug 2026
Case officer
Show
Target decision
21 Oct 2026
Applicant
Show
Agent
HARTLEPOOL BOROUGH COUNCIL
Hartlepool
Planning Authority Score
3.3/10
Poor
#223 of 296 councils
Relevant to this application:
Householder decisions

Hartlepool is slower than most councils at deciding householder applications, ranking #227 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hartlepool decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #55 of 296
93%
Householder approved
Above avg (90%) #129 of 296
52%
Decided in 8 weeks
Below avg (63%) #227 of 296
53%
Extended time limit
Above avg (41%) #240 of 296
91%
Minor dwellings approved
11 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
75%
Change of use approved
12 decided
224
Total decisions
15 refused in the year to March 2026