Sofa Delivery Company, Swift Park, Rugby, CV21 1DZ Data via plota.co.uk

R26/0856 - 8 Weeks PA SiteNoticeRequired

Proposal

Installation of new roller shutter door and associated external works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
✓
Validated
9 Oct 2026
✓
Consultation
20 Oct 2026
Decision
Expected by 18 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 2 Dec 2026 and 20 Dec 2026, from Rugby's recent extensions.

Comments are open until 30 Oct 2026

Comment on this application ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Rugby AQMA (NO2)
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve 168 m away: Swift Valley
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project 347 m away: The Grand Union Canal Transfer, at pre-application; Inside the Rugby built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 10 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area6,013 m² (64,723 sq ft)
Energy ratingD (asset rating 89)
UseB8 Storage or Distribution
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in July 2012, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Rugby - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rugby
Application type
8 Weeks PA
Postcode
CV21 1DZ
Received
15 Sept 2026
Validated
9 Oct 2026
Case officer
Show
Target decision
18 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
WHITEBOX ARCHITECTURE + DESIGN

Decision outlook

Day 20 of the 56-day target. Rugby usually decides extensions by day 62.

Day 2042 days to the predicted decision (day 62)
44%decided within 8 weeks
94%approved
187decided in the last year

Plota live figures for extensions decided by Rugby in the last twelve months, from validation. Rugby decision record →

Consultation & key dates

Alt. reference
PP-15197459
Comments by
30 Oct 2026
Site or press notice
9 Oct 2026
Statutory expiry
10 Nov 2026
Rugby
Planning Authority Score
2.7/10
Poor
#243 of 296 councils
Relevant to this application:
Householder decisions

Rugby is one of the slowest councils in England for householder decisions, ranking #271 out of 296. The council extends the time limit on 57% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rugby decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #65 of 296
94%
Householder approved
Above avg (90%) #115 of 296
38%
Decided in 8 weeks
Below avg (63%) #271 of 296
57%
Extended time limit
Above avg (41%) #260 of 296
93%
Minor dwellings approved
28 decided (1-9 homes)
71%
Major dwellings approved
7 decided (10+ homes)
88%
Change of use approved
8 decided
466
Total decisions
31 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.