Crescent House, 130-140 Wembley Park Drive, Wembley, HA9 8HP Data via plota.co.uk

26/1702 - Conditions pursuant to a full permission Approved

Proposal

Details pursuant to Condition 13 (Construction Logistics Plan), Condition 14 (Construction Method Statement) and Condition 15 (Construction Ecological Management Plan) of Full Planning Permission reference dated 18/12/2025 for Demolition of the existing building and redevelopment of the site with a residential-led (Use Class C3) building with flexible commercial/community floorspace (Use Class E/F) at ground level; new basement excavation; cycle stores and blue badge parking; refuse stores and plant rooms/equipment; hard and soft landscaping including part-naturalisation of the Wealdstone Brook; new play space; and all associated engineering and ancillary works and subject to a Deed of Agreement dated 18 December 2025 under Section 106 of the Town and Country Planning Act 1990, as amended. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Jul 2026
✓
Approved
28 Oct 2026

Approved on 28 Oct 2026 · Delegated Team Manager · Last checked 28 Oct 2026

Documents 58

Statements & assessments 27

PDF Pilling method statement part 1 Supporting Documents · 22 Jul 2026 View ↗ PDF Pilling method statement part 2 Supporting Documents · 22 Jul 2026 View ↗ PDF Pilling method statement part 3 Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ IMG Appendix a - pre-condition survey photos Supporting Documents · 22 Jul 2026 View ↗ PDF Appendix b - arboriculture plan Supporting Documents · 22 Jul 2026 View ↗ PDF Appendic c - tree surgeon and arboriculture qualification Supporting Documents · 22 Jul 2026 View ↗ PDF Bng metric Supporting Documents · 22 Jul 2026 View ↗ PDF Bng report Supporting Documents · 22 Jul 2026 View ↗ PDF Appendix 20 - construction ecological management plan Supporting Documents · 6 Jul 2026 View ↗

All documents on the council site ↗

Associated applications 7

Site constraints 8

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Wembley Park
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Flood defence 17 m away (engineered high ground, designed for a 1 in 50 year flood); Inside the Brent built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Designated open space 46 m away.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,720 m² (18,514 sq ft)
Energy ratingD (asset rating 100)
UseNon-residential Institutions: Education
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in October 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Conditions pursuant to a full permission
Postcode
HA9 8HP
Received
3 Jul 2026
Validated
3 Jul 2026
Ward
Wembley Park
Case officer
Show
Target decision
14 Oct 2026
Decision
Permission Granted
Decision date
28 Oct 2026
Decision level
Delegated Team Manager
Applicant
Show
Agent
Hill Group UK
Freehold owner
Show

Public comments

No public comments yet.

Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15057358
Planning Portal ref
PP-15057358
Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.