Crescent House, 130-140 Wembley Park Drive, Wembley, HA9 8HP Data via plota.co.uk

26/1874 - Conditions pursuant to a full permission Registered

Proposal

Details pursuant to Condition 7 (refuse Storage facilities), Condition 23 (safety fencing and management), Condition 24 (Counter Terrorism Measures), Condition 25 (Details of All External Materials), Condition 26 (Microclimate Mitigation Measures), Condition 27 (Detailed layout plans of Accessible and Adaptable Dwellings), Condition 28 (Cycle Parking) & Condition 29 (Commercial Refuse Storage Facilities) of Full Planning permission reference dated 18/12/2025 for Demolition of the existing building and redevelopment of the site with a residential-led (Use Class C3) building with flexible commercial/community floorspace (Use Class E/F) at ground level; new basement excavation; cycle stores and blue badge parking; refuse stores and plant rooms/equipment; hard and soft landscaping including part-naturalisation of the Wealdstone Brook; new play space; and all associated engineering and ancillary works and subject to a Deed of Agreement dated 18 December 2025 under Section 106 of the Town and Country Planning Act 1990, as amended. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Jul 2026
Decision
Target date was 30 Sept 2026

Under consideration

No decision has been issued yet. A decision is expected by 30 Sept 2026.

The consultation period closed on 31 Aug 2026.

Documents 51

Plans & drawings 41

PDF Metalwork external location plan Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Metalwork - external railing Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Second floor layout - communal areas, access control, fire alarm & security plan Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Third floor layout - communal areas, access control, fire alarm & security plans Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Fourth floor layout - communal areas, access control, fire alarm & security plan Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Fifth floor layout - communal areas, access control, fire alarm & security plans Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Sixth floor layout - communal areas, access control, fire alarm & security plan Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Seventh floor layout - communal areas, access control, fire alarm & security pla Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Eighth floor layout (typical 08-16) - communal areas, access control, fire alarm Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Ninth floor layout - communal areas, access control, fire alarm & security plans Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Tenth floor layout - communal areas, access control, fire alarm & security plans Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Eleventh floor layout - communal areas, access control, fire alarm & security pl Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Twelveth floor layout - communal areas, access control, fire alarm & security pl Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Thirteenth floor layout - communal areas, access control, fire alarm & security Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Fourteenth floor layout - communal areas, access control, fire alarm & security Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Fifteenth floor layout - communal areas, access control, fire alarm & security p Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Sixteenth floor layout - communal areas, access control, fire alarm & security p Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Seventeenth floor layout - communal areas, access control, fire alarm & security Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Eighteenth floor layout (typical 18-23) - communal areas, access control, fire a Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Nineteenth floor layout - communal areas, access control, fire alarm & security Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Twentieth floor layout - communal areas, access control, fire alarm & security p Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Twenty first floor layout - communal areas, access control, fire alarm & securit Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Twenty second floor layout - communal areas, access control, fire alarm & securi Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Twenty third floor layout - communal areas, access control, fire alarm & securit Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Twenty fourth floor layout (typical 24-29) - communal areas, access control, fir Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Twenty fifth floor layout - communal areas, access control, fire alarm & securit Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Twenty sixth floor layout - communal areas, access control, fire alarm & securit Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Twenty seventh floor layout - communal areas, access control, fire alarm & secur Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Twenty eighth floor layout - communal areas, access control, fire alarm & securi Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Twenty ninth floor layout - communal areas, access control, fire alarm & securit Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Thirtieth floor layout - communal areas, access control, fire alarm & security p Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Basement layout - communal areas, access control, fire alarm & security plans Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Mezzanine floor layout - communal areas, access control, fire alarm & security p Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Ground floor layout - communal areas, access control, fire alarm & security plan Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF First floor layout (typical 01-07) - communal areas, access control, fire alarm Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Accessibility strategy plan - level 01 typical Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Preliminary accommodation schedule- social rent Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Preliminary accommodation schedule- private Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Cycle strategy plan - gf Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Cycle strategy plan - b1 Submitted Drawings Plans · 22 Jul 2026 View ↗ PDF Refuse strategy plan Submitted Drawings Plans · 22 Jul 2026 View ↗

All documents on the council site ↗

Associated applications 7

Site constraints 8

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Wembley Park
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Flood defence 17 m away (engineered high ground, designed for a 1 in 50 year flood); Inside the Brent built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Designated open space 46 m away.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Conditions pursuant to a full permission
Postcode
HA9 8HP
Received
22 Jul 2026
Validated
22 Jul 2026
Ward
Wembley Park
Case officer
Show
Target decision
30 Sept 2026
Decision level
Delegated Team Manager
Applicant
Show
Agent
Hill Group
Freehold owner
Show

Public comments

No public comments yet.

Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15100753
Planning Portal ref
PP-15100753
Comments by
31 Aug 2026
Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.