1 Hall Gardens Rawcliffe East Riding Of Yorkshire DN14 8TP Data via plota.co.uk

26/02156/TPO - Works to Protected Trees Pending Consideration

Proposal

TPO - RAWCLIFFE NO. 1 - 1994 (REF 14) T17 & T18 - Crown reduce 2 no. Robinia trees (T17 & T18) by 3 metres to prevent future possible damage to buildings, further growth into neighbouring trees, and falling branches causing possible harm Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
Decision
Expected by 12 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 53.

The consultation period closed on 10 Sept 2026.

Site constraints 8

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers and the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 684 m away: Yorkshire and Humber CCS Cross Country Pipeline
The site is 684 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Drax Bioenergy with Carbon Capture and Storage Project (decided, 1550 m); East Coast Hydrogen Humber Pipeline (at pre-application, 94 m); Humber Carbon Capture Pipeline (at pre-application, 1039 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Protected tree 12 m away: Rawcliffe No. 1 - 1994, order TPO14; Coalfield, development low risk area; Inside the Rawcliffe built-up area; Conservation area 98 m away: Rawcliffe; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £220,000 in October 2003. Detached house, freehold.

17 October 2003£220,000New build

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area116 m² (1,249 sq ft)
Energy ratingD (66 out of 100), could reach C
PropertyDetached house, 7 habitable rooms
Built1996 to 2002
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in May 2014, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Protected Trees
Postcode
DN14 8TP
Received
17 Aug 2026
Validated
17 Aug 2026
Ward
Snaith, Airmyn & Rawcliffe & Marshland
Parish
Rawcliffe Parish Council
Case officer
Show
Target decision
12 Oct 2026
Applicant
Show

Decision outlook

Day 53, past East Riding's usual 36 days for tree and landscaping works. 100% are decided within thirteen weeks, so most likely by 16 Nov 2026.

Day 533 days to the 56-day target
94%decided within 8 weeks
97%approved
582decided in the last year

Plota live figures for tree and landscaping works decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15162327
Planning Portal ref
PP-15162327
Comments by
10 Sept 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.