2026/0240 - Discharge of Conditions Approved

Proposal

Discharge of Condition 15 Phases 1 and 2, (Construction Management Plan) and Condition 20 (Construction Surface Water Management Plan) pursuant to planning approval 2025/0378. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jun 2026
✓
Validated
2 Jul 2026
✓
Consultation
17 Aug 2026
✓
Approved
1 Sept 2026

Approved on 1 Sept 2026 · Last checked 4 Sept 2026

Associated applications 4

Site constraints 9

Article 4 direction
Immediate Article 4 Direction for small Houses in Multiple Occupation. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
5 listed buildings within 150 m
Nearest: Gate Arch to Garden of Rockcliffe House, Grade II, 38 m away · 5 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic England ↗
Also on the record
Radon affected area, class 4; Coalfield, development low risk area; Inside the Bacup built-up area; National infrastructure project 1135 m away: Calderdale Energy Park, at pre-application; Priority habitat 38 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area2,928 m² (31,517 sq ft)
Energy ratingC (asset rating 68)
UseB1 Offices and Workshop businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in October 2012, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Rossendale - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rossendale
Application type
Discharge of Conditions
Postcode
OL13 0BB
Received
30 Jun 2026
Validated
2 Jul 2026
Ward
Britannia And Lee Mill
Case officer
Show
Target decision
1 Oct 2026
Decision
Condition(s) Discharged
Decision date
1 Sept 2026
Agent
Caulmert Ltd

Public comments

No public comments yet.

Last counted 4 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
17 Aug 2026
Comments by
7 Sept 2026
Statutory expiry
1 Oct 2026
Env. assessment
No
Rossendale
Planning Authority Score
1/10
Poor
#293 of 296 councils
Relevant to this application:
Householder decisions

Rossendale is one of the slowest councils in England for householder decisions, ranking #287 out of 296. The council extends the time limit on 75% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rossendale decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #197 of 296
88%
Householder approved
Below avg (90%) #222 of 296
27%
Decided in 8 weeks
Below avg (63%) #287 of 296
75%
Extended time limit
Above avg (41%) #293 of 296
85%
Minor dwellings approved
34 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
59%
Change of use approved
17 decided
231
Total decisions
33 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.