Norwich MPTC Driving Test Centre 16A Peachman Way Thorpe St Andrew Norfolk NR7 0WF Data via plota.co.uk

2026/0181 - Full Approved

Proposal

Decarbonisation works including roof mounted solar PV array, VRV with external condenser and Temporary 2-Storey PAU accommodation for the duration of the project. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Jan 2026
✓
Validated
2 Jun 2026
✓
Consultation
24 Jun 2026
✓
Approved
14 Jul 2026

Approved on 14 Jul 2026 · Delegated · Last checked 9 Sept 2026

Documents 24

All documents on the council site ↗

Site constraints 4

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 2, surveyed
Best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Cambridge). Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3; the survey is the definitive reading.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
National infrastructure project 422 m away: Norwich Northern Distributor Road (NDR)
The site is 422 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Norwich built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area182 m² (1,959 sq ft)
Energy ratingC (asset rating 75)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in April 2016, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
NR7 0WF
Received
21 Jan 2026
Validated
2 Jun 2026
Ward
Thorpe St Andrew South East
Parish
Thorpe St Andrew
Case officer
Show
Target decision
28 Jul 2026
Decision
Approval with Conditions
Decision date
14 Jul 2026
Decision level
Delegated
Applicant
Show
Agent
McAndrew Martin

How this decision compares

Decided in 42 days from validation, 13 days faster than South Norfolk Broadland's median of 55 for utility and infrastructure works. Approved, as 100% of utility and infrastructure works here are.

58%decided within 8 weeks
100%approved
105decided in the last year

Plota live figures for utility and infrastructure works decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

6 neighbours consulted · Last counted 9 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14622994
Planning Portal ref
PP-14622994
Neighbours
24 Jun 2026
Consultation
24 Jun 2026
Comments by
13 Jul 2026
Site or press notice
22 Jun 2026
Statutory expiry
28 Jul 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Householder decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.