Land Adj 2 Park Cottages Wroxham Road Sprowston Norfolk Data via plota.co.uk

2025/2146 - Outline Refused

Proposal

Outline permission for one self-build dwelling with all matters reserved Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Jul 2025
✓
Validated
28 Jul 2025
✓
Consultation
4 Sept 2025
✗
Refused
8 Dec 2025
Appeal
Not lodged

Refused on 8 Dec 2025 · Delegated · Last checked 15 Oct 2026

Site constraints 5

Nutrient neutrality catchment: Bure Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 891 m away: Norwich Northern Distributor Road (NDR)
The site is 891 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Tree preservation order 23 m away: The Broadland District Council Tree Preservation Order Sprowston 2011 No.20; Priority habitat 23 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Outline
Postcode
NR13 6LZ
Received
16 Jul 2025
Validated
28 Jul 2025
Ward
Sprowston East
Parish
Sprowston
Case officer
Show
Target decision
22 Sept 2025
Decision
Refusal
Decision date
8 Dec 2025
Decision level
Delegated
Applicant
Show
Agent
planning and building consultant

How this decision compares

Decided in 133 days from validation, 39 days faster than South Norfolk Broadland's median of 172 for outline applications. Refused, as 63% of outline applications here are.

11%decided within 8 weeks
37%approved
8%go to committee

Plota live figures for outline applications decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

2comments received
1 objecting1 neutral

4 neighbours consulted · Last counted 15 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14182172
Planning Portal ref
PP-14182172
Neighbours
4 Sept 2025
Consultation
4 Sept 2025
Comments by
2 Oct 2025
Site or press notice
14 Aug 2025
Statutory expiry
22 Sept 2025
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Major dwellings

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026