Former BBC Television Centre Wood Lane London W12 Data via plota.co.uk

2025/02335/NMAT - Non-Material Amendment Submission Approved

Proposal

Non-material Amendment to Condition no. 3 (Drawings) and Condition no. 60 (Residential Car Parking Provision) of planning permission (ref. ) dated 22 August 2017; in relation to Plot E; to include amendments to remove all parking provision allocated to BBC, and to allocate all spaces to residential parking, increase overall number of residential car parking provision on site and to amend the wording of condition no. 60. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Aug 2025
✓
Validated
29 Aug 2025
✓
Approved
28 Nov 2025

Approved on 28 Nov 2025 · Last checked 19 Oct 2026

Associated applications 9

Site constraints 7

Wood Lane conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
1 listed building within 150 m
Nearest: Bbc Television Centre, Including the Main Circular Range Excluding the Spur, the Original Scenery Block and the Former Canteen, Grade II, 47 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 1413 m away: Thames Tideway Tunnel; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment Submission
Received
28 Aug 2025
Validated
29 Aug 2025
Ward
White City
Case officer
Show
Decision
APPLICATION APPROVED
Decision date
28 Nov 2025
Applicant
Show
Agent
Anna Collingwood-Smith / Gerald Eve LLP

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
8 Sept 2025
Comments by
26 Sept 2025
Statutory expiry
28 Nov 2028
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026