26/90023/ELC - Electricity Board Consultation Pending Consideration

Proposal

Replace the existing open wire conductors in favour a Aerial Bunched Conductor Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Oct 2026
Decision
Expected by 3 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 17 Dec 2026 and 27 Dec 2026, from Calderdale's recent utility and infrastructure works.

Site constraints 7

Also on the record
1 listed building within 150 m; Nature recovery project: Bradford and South Pennines; Radon affected area, class 2; Coalfield, development low risk area; Inside the Halifax built-up area; Priority habitat 30 m away: Deciduous woodland; National infrastructure project 1627 m away: Calderdale Energy Park, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 24 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Calderdale - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Calderdale
Application type
Electricity Board Consultation
Received
22 Oct 2026
Validated
22 Oct 2026
Ward
Halifax Town
Parish
Not In A Parish
Target decision
3 Dec 2026
Applicant
Show

Decision outlook

Day 8 of the 56-day target. Calderdale usually decides utility and infrastructure works by day 56.

Day 848 days to the 56-day target
52%decided within 8 weeks
92%approved
27decided in the last year

Plota live figures for utility and infrastructure works decided by Calderdale in the last twelve months, from validation. Calderdale decision record →

Public comments

No public comments yet.

Last counted 24 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
3 Dec 2026
Env. assessment
No
Calderdale
Planning Authority Score
2.7/10
Poor
#240 of 296 councils
Relevant to this application:
Householder decisions

Calderdale ranks #193 out of 296 councils for householder decision speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Calderdale decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #192 of 296
87%
Householder approved
Below avg (90%) #229 of 296
58%
Decided in 8 weeks
Below avg (63%) #193 of 296
50%
Extended time limit
Above avg (41%) #223 of 296
73%
Minor dwellings approved
103 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
89%
Change of use approved
61 decided
856
Total decisions
121 refused in the year to March 2026