Ebbsfleet Central East Land Adjacent To Ebbsfleet International Railway Station Thames Way Kent Data via plota.co.uk

26/01032/EDCCON - Consultation by EDC to DBC Awaiting decision

Proposal

Re-Consultation on an application for the discharge of condition 13 (Site wide Operational Waste Management Strategy) pursuant to outline planning permission reference (Ebbsfleet Central East, Site Wide), within Ebbsfleet Development Corporation… Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
4 Sept 2026
Decision
Expected by 25 Sept 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 25 Sept 2026.

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
HMO Article 4(1) Direction North Order 2025. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dartford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dartford
Application type
Consultation by EDC to DBC
Received
4 Sept 2026
Validated
4 Sept 2026
Ward
Ebbsfleet
Parish
Not Parished
Case officer
Show
Target decision
25 Sept 2026
Applicant
Show
Agent
Ebbsfleet Development Corporation

Public comments

No public comments yet.

Last counted 12 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
EDC/26/0048
Statutory expiry
25 Sept 2026
Env. assessment
No
Dartford
Planning Authority Score
5/10
Average
#146 of 296 councils
Relevant to this application:
Householder decisions

Dartford is faster than most councils at deciding householder applications, ranking #92 out of 296. Dartford is also one of the strictest councils - it refuses more householder applications than almost any other, with only 80% approved vs 90% nationally.

One of the strictest councils
only 80% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Dartford decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #264 of 296
80%
Householder approved
Below avg (90%) #278 of 296
73%
Decided in 8 weeks
Above avg (63%) #92 of 296
33%
Extended time limit
Below avg (41%) #74 of 296
61%
Minor dwellings approved
46 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
68%
Change of use approved
25 decided
595
Total decisions
126 refused in the year to March 2026