Fulham Football Club,Stevenage Road,London,Hammersmith And Fulham,SW6 6HH Data via plota.co.uk

P/2026/00744/NMAT - Non-Material Amendment Submission Approved

Proposal

Non-material amendment to planning permission ref: granted 19th May 2020 for the 'Material amendment to planning permission reference: granted 10th December 2018 for the: 'Demolition of the riverside stand and partial reconfiguration of the Putney stand western end and Hammersmith stand ( Western end) and removal of four floodlight masts and the development of a new riverside stand providing two tiers of seating creating an overall seating capacity of up to 29,600 a new extended section of a riverside walkway basement leisure / retail provision for A1 A3 A4 A5 D2 use classes 9 serviced apartments (use class C1) parking a new river wall a temporary construction river platform and construction compound and associated landscaping including boundary work lighting including new and replacement floodlighting and ground works and all ancillary or incidental works and structures.' Amendments sought are for the re-configuration together with internal and external alterations to the Riverside stand to facilitate a health club at the Putney End including; relocation of five serviced apartments from the Putney end to the Hammersmith end; relocation of a heat and power system at basement level; amended design of screening at level 5 of the Riverside Stand; alteration to the internal layout of cycle parking and re-siting of enclosed cycle parking adjacent to the ground floor of proposed health club; removal of backup generator; relocation of Putney Stand compactor to level 1 of riverside stand and associated minor internal and external alterations' to allow amendments to the approved drawings to include: Introduction of a canopy above the main entrance at ground floor level; minor alterations to Level 4 pool terrace, including provision of a small shower area, and alterations to the staircase; and minor alterations to Level 05 terrace bars to introduce a raised decking area at the Putney end, and a riser protection enclosure at the Hammersmith end. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Mar 2026
✓
Validated
13 Mar 2026
✓
Approved
26 May 2026

Approved on 26 May 2026 · Last checked 21 Sept 2026

Documents 38

All documents on the council site ↗

Associated applications 6

Licences at this address

And 3 more at this address

Licensed hours are what the licence permits, not opening times.

Site constraints 11

Grade II listed: Office to South of Grandstand at Fulham Football Club
List entry 1358582 · 5 m away · 1 more listed building within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Fulham Reach conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Registered park or garden 33 m away: Bishop's Park
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
SSSI 481 m away: Barn Elms Wetland Centre SSSI; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Designated open space 16 m away; Metropolitan Open Land 29 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area13,475 m² (145,044 sq ft)
Energy ratingB (asset rating 42)
UseGeneral Assembly and Leisure, Night Clubs, and Theatres
HeatingAir Conditioning

From the energy performance certificate lodged in July 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment Submission
Postcode
SW6 6HH
Received
12 Mar 2026
Validated
13 Mar 2026
Ward
Palace And Hurlingham
Case officer
Show
Decision
Application Approved
Decision date
26 May 2026
Applicant
Show

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
13 Mar 2026
Statutory expiry
10 Apr 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.