East Anglia 3 Onshore Converter Station Bullen Lane Bramford IP8 4JL Data via plota.co.uk

DC/26/02447 - Discharge of Requirement Approved

Proposal

East Anglia 3 Onshore Converter Station - Application pursuant to discharge of requirements 24 and 25(2)(f) to agree out of hours working on the following dates: 4th June to 10th July - 19:00 to 07:00 for 12 hours of nightshift working Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Jun 2026
✓
Validated
9 Jun 2026
✓
Consultation
9 Jun 2026
✓
Approved
29 Jun 2026

Approved on 29 Jun 2026 · Last checked 5 Jul 2026

Site constraints 4

National infrastructure project: Norwich to Tilbury
The site is inside the project boundary. Electricity line, examination closed, recommendation due. Also within 2 km: Bramford to Twinstead (decided, about 188 m); East Anglia THREE Offshore Wind Farm (decided, about 218 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Burstallhill built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Babergh Mid Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Requirement
Postcode
IP8 4JL
Received
8 Jun 2026
Validated
9 Jun 2026
Ward
Bramford
Parish
Bramford
Case officer
Show
Target decision
16 Jun 2026
Decision
Granted
Decision date
29 Jun 2026
Applicant
Show

Consultation & key dates

Consultation
9 Jun 2026
Comments by
30 Jun 2026
Statutory expiry
16 Jun 2026
Env. assessment
No
Babergh Mid Suffolk
Planning Authority Score
7.7/10
Good
#33 of 296 councils
Relevant to this application:
Householder decisions

Babergh Mid Suffolk is faster than most councils at deciding householder applications, ranking #56 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Babergh Mid Suffolk decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #124 of 296
95%
Householder approved
Above avg (90%) #68 of 296
77%
Decided in 8 weeks
Above avg (63%) #56 of 296
34%
Extended time limit
Below avg (41%) #83 of 296
74%
Minor dwellings approved
160 decided (1-9 homes)
73%
Major dwellings approved
11 decided (10+ homes)
93%
Change of use approved
40 decided
882
Total decisions
99 refused in the year to March 2026