The Shoreditch Trust Ltd, 20 East Road, Hackney, London, N1 6AD Data via plota.co.uk

2025/2279 - Full Planning Permission Approved

Proposal

Proposed demolition of the existing dwarf wall and erection of a handrail. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Oct 2025
✓
Validated
17 Oct 2025
✓
Approved
11 Dec 2025

Approved on 11 Dec 2025 · Delegated · Last checked 18 Oct 2026

Site constraints 10

3 Article 4 directions
Whole of the London Borough of Hackney · Exemption Area (part 1) · Hackney Central Activity Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Conservation area 25 m away: Underwood Street; 3 listed buildings within 150 m; National infrastructure project 1807 m away: Thames Tideway Tunnel; Inside the Hackney built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Heritage at risk 94 m away: Moorfields.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Full Planning Permission
Postcode
N1 6AD
Received
16 Oct 2025
Validated
17 Oct 2025
Ward
Hoxton West Ward
Case officer
Show
Target decision
12 Dec 2025
Decision
Grant
Decision date
11 Dec 2025
Decision level
Delegated
Applicant
Show
Agent
Cadoo Limited

How this decision compares

Decided in 55 days from validation, about the council's usual 56 days. Approved, as 84% of extensions here are.

54%decided within 8 weeks
84%approved
1,130decided in the last year

Plota live figures for extensions decided by Hackney in the last twelve months, from validation. Hackney decision record →

Consultation & key dates

Statutory expiry
12 Dec 2025
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 councils
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications, ranking #220 out of 296. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026