Fulham Gas Works Imperial Road London Data via plota.co.uk
Proposal
Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under granted 17 January 2025 of planning permission granted 8 February 2019 (as amended by refs and ). As varied by variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission granted 8 Feb 2019 (as amended by refs and ). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangement of solid facade panels, facade articulation depth, spandrel details, balustrades and glazed screens, tower top core expression, BMU enclosure, omission of the winter garden facade typology and the introduction of a canopy to the residential entrance; (c) revisions to the core configuration; (d) introduction of 14 additional dwellings; (e) reconfiguration of lobby space in Plot H1 to omit cycle lift and provide additional residential amenity space; (f) introduction of structural separation between Plots H1 and H2 at basement level (and below ground phasing boundary), reduction of excavation depth, reconfiguration of car parking (including uplift in provision), cycle parking and waste/refuse storage and introduction of residential storage; and (g) provision of a fully accessible roof terrace at shoulder level and updated basement ventilation within public realm. The proposed amendments relate to Phase 4b (Development Plot H1) only. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. A decision is expected by 18 Sept 2026.
Documents 109
Plans & drawings 99
Application forms 2
Other documents 8
Associated applications 17
Part of
Conditions details submitted for 1, 16, 20, 40, 62, 71, 73, 74, 82, 87, 88, 89 · variation sought for , ,
- Reserved mattersarchive
Conditions variation sought for 1, 4, 5
- VariationVariation of Condition 1 (Drawings) of reserved matters details relating to the approval…This applicationP/2026/01890/VAR
Show 14 more · 4 approved, 9 pending
- Variationarchive
- Amendmentarchive
- Amendmentarchive
Site constraints 7
Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in December 2024, the latest held for this property. The building may have changed since. View the certificate
Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Unit 6, Imperial Studios, 3-9 Imperial Road, London, SW6 2AG
Installation of an air conditioning unit and a kitchen extract duct to the roof ...
7 Imperial Studios, Suite 6, Imperial Road, London, SW6 2AG
Proposed use of the existing unit as Class E(g)(iii).
Imperial Studios, 7 Imperial Road, London, SW6 2AG
Variation of Condition 2 of the planning permission reference: 2023/00960/FUL da...
Unit 3, Imperial Studios, 3-9 Imperial Road, London, SW6 2AG
Installation of 2no floor mounted air source heat pumps with metal louvred scree...
Nearby new applications
53 Broughton Road, London, SW6 2LE
Erection of a rear extension at second floor level, over part of the existing ba...
4-5 SOTHERON PLACE, LONDON, SW6 2EJ
Submission of details and samples of the 1.8m high obscure glazing and privacy s...
176 Wandsworth Bridge Road, London, SW6 2UQ
Variation of Condition 2 (approved drawings) of planning permission reference: 2...
176 Wandsworth Bridge Road, London, SW6 2UQ
Submission of full details of the cycle storage fixtures/fittings to serve the a...
113 - 115 Wandsworth Bridge Road, London, SW6 2TE
Submission of details of a construction management and logistics plan, pursuant ...
55 Perrymead Street, London, SW6 3SN
Non-material amendment to planning permission ref: P/2026/00960/HH granted 8th S...
Important details
- Council
- Hammersmith and Fulham
- Application type
- Removal/Variation of Conditions (Section 73)
- Postcode
- SW6 2AN
- Received
- 15 May 2026
- Validated
- 24 Jul 2026
- Ward
- Parsons Green And Sandford|Sands End
- Case officer
- Show
- Applicant
- Show
Consultation & key dates
- Consultation
- 27 Jul 2026
- Comments by
- 28 Aug 2026
- Site or press notice
- 5 Aug 2026
- Statutory expiry
- 16 Oct 2026
Historical activity at this location
11 nearby applications on record - archival context, not part of the live application.
Nearby activity
Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
Fulham Gas Works Imperial Road London
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
Fulham Gas Works Imperial Road London
Reserved Matters Application relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping in compliance with Condition 1 (Reserved Matters Details), Condition 4 (Outline Component Drawings) and Condition 5 (Design Codes, Development Specification and Parameter Plans); of planning permission (ref: 2018/02100/COMB)…
- Received
- 10 Jun 2024
- Decided
- 17 Jan 2025
- Outcome
- Approved
- Type
- Outline
Fulham Gas Works Imperial Road London
Planning Application (part-detailed, part-outline) for demolition of existing buildings and structures (excluding No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Former Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings ranging from 1 to 37 storeys to provide up to 1,843 (including 646 Affordable Housing) residential units and ancillary residential facilities (C3 Use) and non-residential…
- Received
- 14 Jun 2018
- Decided
- 8 Feb 2019
- Outcome
- Approved
Fulham Gasworks Imperial Road London
Non-material amendment to permission 2018/02100/COMB, 8 Feb 2019, to remove figures / unit numbers from description; amend ground floor of Phases 1a 1b 1c; amend Condition 10 (Floorspace) to increase ancillary residential by 1,622 sqm to 3,420 sqm and reduce D1/D2 use by 1,622 sqm to 2,710 sqm. Planning Application for demolition of existing buildings and structures (excluding No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Former Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and…
- Received
- 30 Apr 2020
- Outcome
- Pending
Fulham Gas Works Imperial Road London
Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019, to vary the Description of Development, removing the reference to the range of building heights "ranging from 1 to 37 storeys" within the description of development. Description of Development to read; "Planning Application for demolition of existing buildings and structures (excluding No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Former Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and…
- Received
- 11 Apr 2024
- Decided
- 20 May 2024
- Outcome
- Approved
Fulham Gas Works Imperial Road London
Variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 019 (as amended by Refs 2020/01088/NMAT and 2024/00818/NMAT); "Planning Application (part-detailed, part-outline) for demolition of existing buildings and structures (excl. No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the…
- Received
- 25 Apr 2024
- Decided
- 3 Dec 2024
- Outcome
- Approved
- Type
- Conditions

The consultation period closed on 28 Aug 2026.