Fulham Gas Works Imperial Road London Data via plota.co.uk

P/2026/01890/VAR - Removal/Variation of Conditions (Section 73) REGISTERED: Under Assessment

Proposal

Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under granted 17 January 2025 of planning permission granted 8 February 2019 (as amended by refs and ). As varied by variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission granted 8 Feb 2019 (as amended by refs and ). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangement of solid facade panels, facade articulation depth, spandrel details, balustrades and glazed screens, tower top core expression, BMU enclosure, omission of the winter garden facade typology and the introduction of a canopy to the residential entrance; (c) revisions to the core configuration; (d) introduction of 14 additional dwellings; (e) reconfiguration of lobby space in Plot H1 to omit cycle lift and provide additional residential amenity space; (f) introduction of structural separation between Plots H1 and H2 at basement level (and below ground phasing boundary), reduction of excavation depth, reconfiguration of car parking (including uplift in provision), cycle parking and waste/refuse storage and introduction of residential storage; and (g) provision of a fully accessible roof terrace at shoulder level and updated basement ventilation within public realm. The proposed amendments relate to Phase 4b (Development Plot H1) only. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 May 2026
✓
Validated
24 Jul 2026
Decision
Target date was 18 Sept 2026

Under consideration

No decision has been issued yet. A decision is expected by 18 Sept 2026.

The consultation period closed on 28 Aug 2026.

Documents 109

Plans & drawings 99

PDF BB7 LPFS - KPR-4 - Rev 05 (2026 08 17) Drawing · 17 Aug 2026 View ↗ PDF 260724_KRP_DLAS_H1_SOA Drawing · 24 Jul 2026 View ↗ PDF 260724_KRP_DLAS_H1_SOA_Tracked Drawing · 24 Jul 2026 View ↗ PDF 260724_KRP_H1_DLAS_Addendum Drawing · 24 Jul 2026 View ↗ PDF A-000-X-00-PL Drawing · 24 Jul 2026 View ↗ PDF A-000-X-11-PL Drawing · 24 Jul 2026 View ↗ PDF A-011-X-41-PL Drawing · 24 Jul 2026 View ↗ PDF A-011-X-51-PL Drawing · 24 Jul 2026 View ↗ PDF A-014-X-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-099-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-100-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-101-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-102-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-107-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-109-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-114-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-121-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-122-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-125-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-126-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-127-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-128-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-116-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-120-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-121-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-122-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-125-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-126-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-127-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-130-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-131-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-132-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-133-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-136-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-137-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-138-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-053-X-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-064-X-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-064-X-02-PL Drawing · 24 Jul 2026 View ↗ PDF A-199-X-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-199-X-02-PL Drawing · 24 Jul 2026 View ↗ PDF A-199-X-03-PL Drawing · 24 Jul 2026 View ↗ PDF A-199-X-04-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-100-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-101-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-102-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-109-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-114-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-116-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-H1T-075-120-01-PL Drawing · 24 Jul 2026 View ↗ PDF A-031-112-01-PL Drawing · 15 May 2026 View ↗ PDF A-031-099-01-PL Drawing · 15 May 2026 View ↗ PDF A-H1T-075-112-01-PL Drawing · 15 May 2026 View ↗ PDF A-H1T-075-114-01-PL Drawing · 15 May 2026 View ↗ PDF H1 Amendment App. - Covering Letter v3 Drawing · 15 May 2026 View ↗ PDF A-031-114-01-PL Drawing · 15 May 2026 View ↗ PDF A-000-X-11-PL Drawing · 15 May 2026 View ↗ PDF A-031-133-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-100-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-131-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-126-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-137-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-101-01-PL Drawing · 14 May 2026 View ↗ PDF A-064-X-02-PL Drawing · 14 May 2026 View ↗ PDF A-031-138-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-130-01-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-100-01-PL Drawing · 14 May 2026 View ↗ PDF A-199-X-01-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-121-01-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-128-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-127-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-136-01-PL Drawing · 14 May 2026 View ↗ PDF A-199-X-02-PL Drawing · 14 May 2026 View ↗ PDF A-199-X-03-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-102-01-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-127-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-120-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-116-01-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-101-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-109-01-PL Drawing · 14 May 2026 View ↗ PDF A-199-X-04-PL Drawing · 14 May 2026 View ↗ PDF A-064-X-01-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-122-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-121-01-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-109-01-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-120-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-112-01-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-126-01-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-125-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-102-01-PL Drawing · 14 May 2026 View ↗ PDF A-H1T-075-116-01-PL Drawing · 14 May 2026 View ↗ PDF A-011-X-51-PL Drawing · 14 May 2026 View ↗ PDF A_FGW_PL_000 Drawing · 14 May 2026 View ↗ PDF A-000-X-00-PL Drawing · 14 May 2026 View ↗ PDF A-014-X-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-107-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-132-01-PL Drawing · 14 May 2026 View ↗ PDF A-053-X-01-PL Drawing · 14 May 2026 View ↗ PDF A-031-125-01-PL Drawing · 14 May 2026 View ↗

All documents on the council site ↗

Associated applications 17

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Imperial Square & Gasworks conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 81 m away: Thames Tideway Tunnel
The site is 81 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
3 listed buildings within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area300 m² (3,229 sq ft)
Energy ratingA (asset rating 19)
UseResidential spaces
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in December 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Removal/Variation of Conditions (Section 73)
Postcode
SW6 2AN
Received
15 May 2026
Validated
24 Jul 2026
Ward
Parsons Green And Sandford|Sands End
Case officer
Show
Applicant
Show

Consultation & key dates

Consultation
27 Jul 2026
Comments by
28 Aug 2026
Site or press notice
5 Aug 2026
Statutory expiry
16 Oct 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.