Imperial Studios, 7 Imperial Road, London, SW6 2AG Data via plota.co.uk

REGISTERED P/2026/01641/VAR - Removal/Variation of Conditions (Section 73)
Date received
3 Jul 2026
Date validated
3 Jul 2026
Postcode
SW6 2AG
Type
Removal/Variation of Conditions (Section 73)

Description

Variation of Condition 2 of the planning permission reference: 2023/00960/FUL dated 7th July 2023 for the "External refurbishment of site comprising raising of existing roof, façade improvements, partial repositioning of refuse areas, installation of solar panels, the installation of cycle parking spaces, landscaping and associated works." Amendments sought to the west gable elevation involving bringing the cladding detail back in line with existing brickwork and further away from the neighbouring buildings along Harwood Terrace, omit the roof hip, replace the cladding in full to the same specification and colour as previously approved under application ref: 2023/00960/FUL. Data via plota.co.uk

Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision performance
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026