P/2026/00923/FUL - Full Planning Application REGISTERED: Under Assessment

Proposal

Installation of 2no floor mounted air source heat pumps with metal louvred screenings to southern elevation outside the building; installation of 2no louvre vent openings to southern elevation of the building and relocation of cycle stands. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Apr 2026
✓
Validated
7 May 2026
Decision
Target date was 2 Jul 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 29 Oct 2026; it is now day 175.

The consultation period closed on 17 Jun 2026.

Documents 28

All documents on the council site ↗

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Imperial Square & Gasworks conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 176 m away: Thames Tideway Tunnel
The site is 176 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area648 m² (6,975 sq ft)
Energy ratingA+ (asset rating -1)
UseStorage or Distribution
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in October 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
SW6 2AG
Received
3 Apr 2026
Validated
7 May 2026
Ward
Parsons Green And Sandford
Case officer
Show
Applicant
Show

Decision outlook

Day 175, past the statutory target. 58% of utility and infrastructure works in Hammersmith and Fulham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 27 Oct 2026.

Day 175119 days past the 56-day target
28%decided within 8 weeks
98%approved
43decided in the last year

Plota live figures for utility and infrastructure works decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
19 May 2026
Comments by
17 Jun 2026
Site or press notice
27 May 2026
Statutory expiry
2 Jul 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.