21-25 Northam Road Southampton SO14 0NZ Data via plota.co.uk

26/01100/FUL - Full Application Awaiting decision

Proposal

Alterations and reconfiguration of site from two commercial units (Use Class E) 2x1-bedroom flats and a dwelling to provide 3x1-bedroom flats, 1 x 2-bedroom flat and one ground floor commercial unit (Use Class E), together with replacement bay window to front elevation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 26 Oct 2026
✓
Consultation
27 Oct 2026
Decision
Expected by 21 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 21 Dec 2026 and 28 Dec 2026, from Southampton's recent changes of use.

Comments are open until 17 Nov 2026

Comment on this application ↗

Site constraints 4

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Also on the record
Inside the Southampton built-up area; National infrastructure project about 1919 m away: Solent Gateway 2, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 27 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SO14 0NZ
Received
around 26 Oct 2026
Validated
26 Oct 2026
Ward
Bargate
Case officer
Show
Target decision
21 Dec 2026
Applicant
Show

Decision outlook

Day 3 of the 56-day target. Southampton usually decides changes of use by day 57.

Day 354 days to the predicted decision (day 57)
50%decided within 8 weeks
86%approved
11%go to committee

Plota live figures for changes of use decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

No public comments yet.

24 neighbours consulted · Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
9321
Neighbours
27 Oct 2026
Consultation
27 Oct 2026
Comments by
17 Nov 2026
Statutory expiry
21 Dec 2026
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 councils
Relevant to this application:
Householder decisions

Southampton ranks #158 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026