Peel House Peel Street Southampton SO14 5QT Data via plota.co.uk

25/00218/DIS - Discharge of Conditions Awaiting decision

Proposal

Application for approval of details reserved by condition 9(Completion of a drainage verification report), 10(Submission of a Site Flood Plan), 13(External Lighting Scheme) and 14(Sustainability statement implementation) of permission for erection of a 19-metre high storage building. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 21 Feb 2025
Decision
Target date was 18 Apr 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 29 Oct 2026; it is now day 615.

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 9, 10, 13, 14 awaiting decision

    • ConditionsApplication for approval of details reserved by condition 9(Completion of a drainage…This application25/00218/DIS

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Special protection area 214 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI 452 m away: Lee-on-The Solent to Itchen Estuary SSSI; Inside the Southampton built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 18 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Conditions
Postcode
SO14 5QT
Received
around 21 Feb 2025
Validated
21 Feb 2025
Ward
Bevois
Case officer
Show
Target decision
18 Apr 2025
Applicant
Show
Agent
Boyle & Summers Architects

Decision outlook

Day 615, past the statutory target. 81% of discharge of conditions in Southampton are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 25 Oct 2026.

Day 615559 days past the 56-day target
47%decided within 8 weeks
100%approved
101decided in the last year

Plota live figures for discharge of conditions decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

No public comments yet.

Last counted 25 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
2254
Statutory expiry
18 Apr 2025
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 councils
Relevant to this application:
Householder decisions

Southampton ranks #158 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use