7 Pier Head, Wapping High Street, London, E1W 1PN Data via plota.co.uk

PA/26/01358/NC - Listed Building Consent (S8 P&LBC 1990) Registered

Proposal

Comprehensive refurbishment of existing building, including internal and external restoration works. Replacement and part replacement of timber sash windows, including installation of slim double-glazed units. Erection of single storey lower ground rear extension. Alterations to existing boundary wall to communal passage at lower ground level. Replace existing external gate to communal passage. Installation of two air source heat pumps on the existing area of flat roof. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Aug 2026
✓
Consultation
26 Aug 2026
Decision
Target date was 9 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 30 Oct 2026; it is now day 80.

Site constraints 12

Grade II listed: 5-10, Wapping Pier Head
List entry 1065813 · The pin is inside its outline · 17 more listed buildings within 150 m (16 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 17 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Wapping Pierhead conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 156 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area: Tower Hamlets APA 2.7
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Thames Path 24 m away; Flood defence 23 m away (embankment, designed for a 1 in 1000 year flood); Inside the Tower Hamlets built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Priority habitat 29 m away: Mudflats; Designated open space 39 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £500,000 in March 1998. Terraced house, freehold.

18 March 1998£500,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area189 m² (2,034 sq ft)
Energy ratingD (64 out of 100), could reach B
PropertyMid-terrace house, 8 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in November 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent (S8 P&LBC 1990)
Postcode
E1W 1PN
Received
11 Aug 2026
Validated
11 Aug 2026
Ward
St Katharines and Wapping
Case officer
Show
Target decision
9 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
Chris Dyson Architects

Decision outlook

Day 80, past the statutory target. 90% of extensions in Tower Hamlets are decided within thirteen weeks, which runs to 10 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 28 Oct 2026.

Day 8024 days past the 56-day target
67%decided within 8 weeks
89%approved
333decided in the last year

Plota live figures for extensions decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Site or press notice
26 Aug 2026
Statutory expiry
6 Oct 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Other decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.