Plot H7 Elephant Park London Southwark SE17 1JL Data via plota.co.uk

26/AP/1679 - Approval of Details Approved

Proposal

Details of condition 7 'Landscaping and planting' - with a revised landscaping scheme along the northern side of the plot to replace the CEDEC surfacing with buff colour asphalt surface - as required by reserved matters approval ref. dated 05/03/2019 for 'Application for the approval of reserved matters (access, scale, appearance, layout and landscaping) for Plot H7 within Elephant Park (previously referred to as the Heygate Masterplan), submitted pursuant to Outline Planning Permission ref: . The proposal comprises the construction of a development ranging between 9 and 25 storeys in height (maximum building height 86.75 m AOD), comprising 424 residential units, 1,237sqm (GEA) of flexible retail (Classes A1 - A5) uses and 628 sqm (GEA) flexible retail, community and leisure (Classes A1-A5, D1-D2), car parking, cycle storage, servicing, plant areas, landscaping, public realm, and other associated works.' Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Jun 2026
✓
Validated
12 Jun 2026
✓
Approved
22 Jul 2026

Approved on 22 Jul 2026 · Source Team · Last checked 23 Jul 2026

Associated applications 2

  • Part of

    Reserved mattersApprovedcouncil archive

    Conditions 7 discharged

    • ConditionsDetails of condition 7 'Landscaping and planting' - with a revised landscaping scheme along…This application26/AP/1679

Site constraints 16

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 Article 4 directions
Central Activities Zone · Elephant and Castle Major Town Centre. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Elephant and Castle/ Walworth Road
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Conservation area 18 m away: Yates Estate and Victory
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
National infrastructure project 1037 m away: Thames Tideway Tunnel
The site is 1037 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 509 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Wider setting of protected view 23A.1 Centre of Bridge over the Serpentine to the Palace of Westminster; Radon affected area, class 2; Tree preservation order 7 m away: Elephant Park, Castle Square & South Gardens; 1 listed building within 150 m; Inside the Southwark built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 34 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Approval of Details
Postcode
SE17 1JL
Received
11 Jun 2026
Validated
12 Jun 2026
Ward
North Walworth
Parish
Borough, Bankside And Walworth
Case officer
Show
Target decision
6 Aug 2026
Decision
AOD - Granted
Decision date
22 Jul 2026
Decision level
Source Team
Applicant
Show
Agent
DP9 LTD

Consultation & key dates

Statutory expiry
6 Aug 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026