Former Esso Terminal Howdon Road North Shields Tyne And Wear Data via plota.co.uk

26/01469/SCREIA - EIA Screening Opinion Reg. 5 Awaiting decision

Proposal

Screening opinion request - new bored tunnel under the River Tyne with associated overhead line works to connect to the existing overhead line network Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Oct 2026
✓
Consultation
20 Oct 2026
Decision
Expected by 9 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Nov 2026, from North Tyneside's recent utility and infrastructure works.

Comments are open until 3 Nov 2026

Comment on this application ↗

Site constraints 4

Also on the record
National infrastructure project 1372 m away: A19/A1058 Coast Road Junction Improvement; Radon affected area, class 2; Coalfield, development low risk area; Inside the Tynemouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 20 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Tyneside - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
EIA Screening Opinion Reg. 5
Received
19 Oct 2026
Validated
19 Oct 2026
Ward
Chirton & Percy Main
Parish
North Shields
Case officer
Show
Target decision
9 Nov 2026
Decision level
Delegated Decision

Decision outlook

Day 12 of the 56-day target. North Tyneside usually decides utility and infrastructure works by day 17.

Day 1244 days to the 56-day target
92%decided within 8 weeks
78%approved
138decided in the last year

Plota live figures for utility and infrastructure works decided by North Tyneside in the last twelve months, from validation. North Tyneside decision record →

Public comments

No public comments yet.

Last counted 30 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
20 Oct 2026
Comments by
3 Nov 2026
Statutory expiry
9 Nov 2026
Env. assessment
No
North Tyneside
Planning Authority Score
8.9/10
Excellent
#8 of 296 councils
Relevant to this application:
Householder decisions

North Tyneside is faster than most councils at deciding householder applications, ranking #35 out of 296. Only 25% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Tyneside decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #5 of 296
97%
Householder approved
Above avg (90%) #36 of 296
81%
Decided in 8 weeks
Above avg (63%) #35 of 296
25%
Extended time limit
Below avg (41%) #31 of 296
100%
Minor dwellings approved
5 decided (1-9 homes)
83%
Major dwellings approved
6 decided (10+ homes)
91%
Change of use approved
56 decided
616
Total decisions
20 refused in the year to March 2026