The Market Covent Garden London Data via plota.co.uk

26/06943/FULL - Full Planning Permission Application Pending

Proposal

Refurbishment of existing lanterns and installation of other external lighting to the Market Building including the installation of architectural lighting to columns, window surrounds, cornice and installation of associated cabling, drivers and associated works. (Linked to 26/06926/LBC) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Oct 2026
✓
Validated
28 Oct 2026
Decision
Expected by 23 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 19 Dec 2026 and 30 Dec 2026, from Westminster's recent commercial and major works.

Documents 41

Plans & drawings 23

PDF LIGHTING DETAILS ROOF COLUMN DOWNLIGHT (SHEET 3 OF 10) Drawing · 28 Oct 2026 View ↗ PDF LIGHTING DETAILS ROOF STRUCTURE UPLIGHT (SHEET 2 OF 10) Drawing · 28 Oct 2026 View ↗ PDF LIGHTING DETAILS ROOF MOUNTED SPOTLIGHTS (SHEET 1 OF 10) Drawing · 28 Oct 2026 View ↗ PDF LIGHTING DETAILS CENTRAL AVENUE ROOF COLUMN UPLIGHT (SHEET 10 OF 10) Drawing · 28 Oct 2026 View ↗ PDF LIGHTING DETAILS CENTRAL AVENUE FACADE NICHE LIGHTING (SHEET 9 OF 10) Drawing · 28 Oct 2026 View ↗ PDF LIGHTING DETAILS STONE COLUMN DOWNLIGHT (SHEET 8 OF 10) Drawing · 28 Oct 2026 View ↗ PDF LIGHTING DETAILS LINEAR UPLIGHT TO STONE FACADE (SHEET 7 OF 10) Drawing · 28 Oct 2026 View ↗ PDF LIGHTING DETAILS LINEAR UPLIGHT TO FACADE PANELS (SHEET 6 OF 10) Drawing · 28 Oct 2026 View ↗ PDF LIGHTING DETAILS LINEAR UPLIGHT TO EAVES (SHEET 5 OF 10) Drawing · 28 Oct 2026 View ↗ PDF LIGHTING DETAILS WINDOW REVEAL LIGHTING (SHEET 4 OF 10) Drawing · 28 Oct 2026 View ↗ PDF NORTH HALL NORTH ELEVATION PROPOSED LIGHTING LAYOUT Drawing · 12 Oct 2026 View ↗ PDF SOUTH HALL NORTH ELEVATION PROPOSED LIGHTING LAYOUT Drawing · 12 Oct 2026 View ↗ PDF NORTH HALL SOUTH ELEVATION PROPOSED LIGHTING LAYOUT Drawing · 12 Oct 2026 View ↗ PDF MAIN AVENUE NORTH ELEVATION PROPOSED LIGHTING LAYOUT Drawing · 12 Oct 2026 View ↗ PDF MAIN AVENUE SOUTH ELEVATION PROPOSED LIGHTING LAYOUT Drawing · 12 Oct 2026 View ↗ PDF SOUTH HALL SOUTH ELEVATION PROPOSED LIGHTING LAYOUT Drawing · 12 Oct 2026 View ↗ PDF MAIN INTERIOR WEST ELEVATION PROPOSED LIGHTING LAYOUT Drawing · 12 Oct 2026 View ↗ PDF MAIN INTERIOR EAST ELEVATION PROPOSED LIGHTING LAYOUT Drawing · 12 Oct 2026 View ↗ PDF GROUND FLOOR PLAN PROPOSED LIGHTING LAYOUT Drawing · 12 Oct 2026 View ↗ PDF UPPER LEVEL PLAN PROPOSED LIGHTING LAYOUT Drawing · 12 Oct 2026 View ↗ PDF LIGHTING MANAGEMENT PLAN Background Papers · 12 Oct 2026 View ↗ PDF LOCATION PLAN Location Plan · 12 Oct 2026 View ↗ PDF BLOCK PLAN Drawing · 12 Oct 2026 View ↗

All documents on the council site ↗

Site constraints 10

Grade II* listed: Covent Garden Market Building
List entry 1066949 · The pin is inside its outline · 62 more listed buildings within 150 m (2 Grade I, 4 Grade II*, 56 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 62 with distances
Historic England ↗
Covent Garden conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 Article 4 directions
Article 4 Basement Development Permitted Rights Removed · Article 4 Direction Class E To C3 In Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: City of Westminster APA 1.2
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 192 m away: Thames Tideway Tunnel
The site is 192 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 124 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Town centre: West End
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 4 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area299 m² (3,218 sq ft)
Energy ratingB (asset rating 30)
UseRestaurants and Cafes/Drinking Establishments/Takeaways
HeatingAir Conditioning

From the energy performance certificate lodged in May 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Postcode
WC2E 8RA
Received
12 Oct 2026
Validated
28 Oct 2026
Ward
St James's
Case officer
Show
Target decision
23 Dec 2026
Agent
Newmark Gerald Eve LLP

Decision outlook

Day 9 of the 56-day target. Westminster usually decides commercial and major works by day 57.

Day 948 days to the predicted decision (day 57)
50%decided within 8 weeks
93%approved
282decided in the last year

Plota live figures for commercial and major works decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

No public comments yet.

Last counted 4 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15194749
Planning Portal ref
PP-15194749
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.