Milton Keynes East, Land East and West of A509 London Road, Newport Pagnell, MK16 0JA Data via plota.co.uk

PLN/2026/1633 - Approval of details reserved by a condition Under Consultation

Proposal

Approval of details required by conditions 22 (Strategic Highways Infrastructure (layout and construction)), 49 (Strategic Highways Infrastructure Lighting Details), 50 (Strategic Highways Infrastructure Landscaping Details), 52 (Strategic Highways Infrastructure Biodiversity Enhancement Strategy (BES) and Landscape Ecological Management Plan (LEMP)), 55 (Strategic Highways Infrastructure Landscape Management and Maintenance Plan (LMMP)) and 59 (Strategic Highways Infrastructure Surface Water Drainage Scheme) (all part discharge) of permission ref. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
4 Aug 2026
Validated
26 Aug 2026
Decision
Expected by 21 Oct 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 21 Oct 2026.

Documents 502

Statements & assessments 75

PDF MKE-WSP-P1-IN-DR-SH-105003 Rev C04 - SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRASTRUCTURE MANHOLE SCHEDULE SHEET 3 [N] APPCONIN - Condition Submitted Details · 26 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-SH-05027 Rev C03 - SURFACE WATER DRAINAGE HEADWALL SCHEDULE AGREEMENT 7 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05017 Rev C07 - DRAINAGE LAYOUT SHEET 17 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-CA-00013-P01- Cranfield RBT Microdrainage Calcs APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-SH-05028-P01 - Surface Water Drainage Headwall Schedule Agreement 8 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-DR-DR-105110 Rev C01 - SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRATSRUCTURE LONG SECTIONS SHEET 10 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05112 Rev C02 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 12 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05903 Rev C02 - HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05145-P01 - Surface Water Drainage Long Section Sheet 45 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05902 rev C03 - HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-101003-P01 - Surface Water Drainage Overview Plan Phase 1 Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-XX-XX-DR-CA-00001 - P04 - Highway Drainage MicroDrainage Calculations HIF Network 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-DR-DR-105115 Rev C03 - SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRASTRUCTURE LONG SECTIONS SHEET 15 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05111 Rev C02 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 11 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05021-P01 - Drainage Layout Sheet 21 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05024 Rev C01 - DRAINAGE LAYOUT SHEET 24 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05030-P01 - Drainage Layout Sheet 30 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05022-P01 - Drainage Layout Sheet 22 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-XX-XX-DR-CA-00006 P01 - Highway Drainage MicroDrainage Calculations HIF Network 6 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05118 Rev C03 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 18 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-DR-DR-105009 Rev C04 - DRAINAGE LAYOUT SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05114 Rev C03 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 14 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05020-P01 - Drainage Layout Sheet 20 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05108-P01 - Surface Water Drainage Long Sections Sheet 8 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05013-P01 - Drainage layout Sheet 13 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-SH-05012-P01 - Surface Water Drainage Manhole Schedule Sheet 12 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05106-P01 - Surface Water Drainage Long Sections Sheet 6 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05122Rev C03 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 22 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05025 Rev C02 - DRAINAGE LAYOUT SHEET 25 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05028 Rev C01 - DRAINAGE LAYOUT SHEET 28 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-XX-XX-DR-CA-00005 P01 - Highway Drainage MicroDrainage Calculations HIF Network 5 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-DR-DR-105015 Rev C03 - DRAINAGE LAYOUT SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05010 Rev C05 - DRAINAGE LAYOUT SHEET 10 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05119 Rev C04 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 19 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-DR-SH-105005 Rev C03 - SURFACE WATER DRAINAGE MANHOLE SCHEDULE SHEET 5 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05113 Rev C01 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 13 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05901 Rev C02 - HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-SH-105004-P01 - Surface Water Drainage Manhole Schedule Sheet 4 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05123-P01 - Surface Water Drainage Long Sections Sheet 23 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-DR-SH-105021 Rev C03 - SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRASTRUCTURE HEADWALL SCHEDULE AGREEMENT 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-SH-05025-P01 - Surface Water Drainage Flow Control Schedule APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-XX-XX-DR-CA-00007 - P06 - Highway Drainage MicroDrainage Calculations HIF Network 7 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05907 Rev C01 - HIGHWAY DRAINAGE TYPICAL DETAILS CULVERT 25 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF 2090.52 - PHASE 1 INFRASTRUCTURE: BIODIVERSITY ENHANCEMENT STRATEGY AND LANDSCAPE MANAGEMENT PLAN – REV A APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05109 Rev C02 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 9 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05012-P01 - Drainage Layout Sheet 12 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF Statutory Biodiversity Metric - 24/07/2026- Version 2 (excel) APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05905 Rev C01 - HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 5 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05029 Rev C01 - DRAINAGE LAYOUT SHEET 29 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05014 Rev C03 - DRAINAGE LAYOUT SHEET 14 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05148 Rev C02 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 48 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05906 Rev C01 - HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 6 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05027 Rev C02 - DRAINAGE LAYOUT SHEET 27 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05149 - Surface Water Drainage Long Sections Sheet 49 - Surface Water Drainage Long Sections Sheet 49 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05023 Rev C02 - DRAINAGE LAYOUT SHEET 23 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-SH-05001-P01 - Surface Water Drainage Manhole Schedule Sheet 1 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05117 Rev C03 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 17 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-XX-XX-DR-CA-00008 - P04 - Highway Drainage MicroDrainage Calculations HIF Network 8 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05018 Rev C06 - DRAINAGE LAYOUT SHEET 18 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-SH-05011 Rev C01 - SURFACE WATER DRAINAGE MANHOLE SCHEDULE SHEET 11 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-SH-105022-P01 - Surface Water Drainage Phase 1 Highway Infrastructure Headwall Schedule Agreement 2 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05121 Rev C02 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 21 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05019 Rev C04 - DRAINAGE LAYOUT SHEET 19 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-SH-05010 Rev C01 - SURFACE WATER DRAINAGE MANHOLE SCHEDULE SHEET 10 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-DR-DR-105026 Rev C02 - DRAINAGE LAYOUT SHEET 26 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-SH-05029 Rev C03 - SURFACE WATER DRAINAGE HEADWALL SCHEDULE SECTION 9 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF 2026-07-30_Employment Land_Biodiversity Enhancement Strategy & Landscape Management Plan - REV C (1) APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-SK-00648-P01 - Phase 1 Foul Drainage Layout APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-DR-SH-105002 Rev C05 - SURFACE WATER DRAINAGE MANHOLE SCHEDULE SHEET 2 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05107 Rev C02 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 7 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-01002 Rev C02 - HIGHWAY DRAINAGE NOTES AND LEGEND [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05116 Rev C05 - SURFACE WATER DRAINAGE LONG SECTIONS SHEET 16 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05904 Rev C01 - HIGHWAY DRAINAGE TYPICAL DETAILS SHEET 4 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-DR-DR-105120 Rev C02 - SURFACE WATER DRAINAGE PHASE 1 HIGHWAY INFRASTRUCTURE LONG SECTIONS SHEET 20 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-01000 Rev C01 - SURFACE WATER DRAINAGE KEY PLAN [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗

Plans & drawings 178

PDF X681-HTA01-MK01-XX-DR-L-810-355 Rev C3 - Soiling Sections 6 of 8 [N] APPCONIN - Condition Submitted Details · 26 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29304 Rev P01 - LINK 304 CROSS SECTION APPCONIN - Condition Submitted Details · 26 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29502 Rev C01 - LINK 502 CROSS SECTION [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-600 Rev. C4 - HIF Landscape Planting Plan - Sheet Locations APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-105162-P01 - Private/LLFA Cutoff Ditches Long Sections Sheet 3 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28911 Rev C01 - EASTERN LINK RBT 1 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28303 Rev C01 - LINK 303 LONG SECTION CH 000.000m - CH 146.779m [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-105160-P01 - Private/LLFA Cutoff Ditches Long Sections Sheet 1 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01136 Rev C01 - DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT 2) SHEET 4 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05203 Rev C01 - ATTENUATION BASIN SECTIONS BASIN 14 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-505 Rev. C5 - PHASE 1 HIF LANDSCAPE GA PLAN PAGE 5 OF 5 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28509 Rev C01 - LINK 509 LONGITUDINAL SECTION CH 000.000m - CH 75.000m [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112011 Rev C06 - SIGNAGE LAYOUT SHEET 11 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101311 Rev C01 - PROPOSED STREET LIGHTING LAYOUT SHEET 11 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28910 Rev C01 - EASTERN LINK RBT 1 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101315 Rev C03 - PHASE 1 HIGHWAY INFRASTRUCTURE PROPOSED STREET LIGHTING LAYOUT SHEET 15 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-RP-L-810-901 Rev. C04 - Landscape Management and Maintenance Plan APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112519 Rev C03 - ROAD MARKING LAYOUT SHEET 19 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-DR-DR-05206 - Attenuation Basin Sections Basin 18A-1 - Attenuation Basin Sections Basin 18A-1 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-29301-P01 - Link 301 Cross Sections APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-128917 Rev C01 - A509 RBT 1 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 1 PHASE 1 INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101322 Rev. P01 - Phase 1 Highway Infrastructure, Proposed Street Lighting Layout (Sheet 22) APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01112-P01 - DMRB Compliant Drawing M1 J14 Roundabout 1 (M1 J14 RBT) Sheet 3 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-353 Rev C2 - Soiling Sections 4 of 8 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-602 Rev C3 - PHASE 1 HIF LANDSCAPE PLANTING PLAN PAGE 2 OF 5 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29512 Rev C01 - LINK 512 CROSS SECTIONS [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01123-P01 - DMRB Compliant Drawing Cranfield Link (CL RBT) Sheet 2 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05205 Rev C02 - ATTENUATION BASIN SECTIONS BASIN 16 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-501 Rev C2 - PHASE 1 HIF LANDSCAPE GA PLAN PAGE 1 OF 5 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112509 Rev C04 - ROAD MARKING LAYOUT SHEET 9 PHASE 2 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101314 Rev C02 - PHASE 1 HIGHWAY INFRASTRUCTURE PROPOSED STREET LIGHTING LAYOUT SHEET 14 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112515 Rev C02 - ROAD MARKING LAYOUT SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101321 Rev. P01 - Phase 1 Highway Infrastructure, Proposed Street Lighting Layout (Sheet 22) APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28084 Rev P02 - MAINTENANCE LAYBY LONGITUDINAL SECTIONS SHEET 1 OF 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-630 Rev. C4 - HIF LANDSCAPE LOCATION PLAN - SOILS APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29302 Rev C01 - LINK 302 CROSS SECTIONS [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29139 Rev P05 - LINK 108 CROSS SECTIONS SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-128067 Rev C01 - EASTERN LINK RBT 2 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 3 OF 3 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112518 Rev C03 - ROAD MARKING LAYOUT SHEET 18 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29103 Rev C02 - LINK 101 CROSS SECTION SHEET 3 OF 4 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01109 Rev C01 - DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05201 Rev C02 - ATTENUATION BASIN SECTIONS BASIN 5 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29503 Rev C01 - LINK 503 CROSS SECTION [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-28306-P01 - Link 305 Long Section CH 000.000m – CH 60.000m APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29140 Rev C02 - LINK 108 CROSS SECTIONS SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28511 Rev C01 - LINK 511 LONGITUDINAL SECTION CH 000.000m - CH 25.569m [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01114-P01 - DMRB Compliant Drawing Eastern Link Roundabout 1 (EL RBT 1) Sheet 2 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112517 Rev C04 - ROAD MARKING LAYOUT SHEET 17 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101330 Rev C04 - PHASE 1 HIGHWAY INFRASTRUCTURE PROPOSED STREET LIGHTING KEY & NOTES LAYOUT SHEET 30 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28058 Rev C01 - A509 RBT 1 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 3 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-GE-DR-0670 - Earthwork Plan Sheet 20 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-500 Rev. C4 - HIF LANDSCAPE GA LOCATION PLAN APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29143 Rev C01 - LINK 110 CROSS SECTION SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-356 rev C3 - Soiling Sections 7 of 8 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29104 Rev C02 - LINK 101 CROSS SECTION SHEET 4 OF 4 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112019 Rev C05 - SIGNAGE LAYOUT SHEET 19 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-29102-P01 - Link 101 Cross Sections Sheet 2 of 4 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01134-P01 - DMRB Compliant Drawing Eastern Link Roundabout 1 (EL RBT 1) Sheet 4 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-633 Rev. C4 - PHASE 1 HIF SOILING PLAN PAGE 3 OF 5 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-128918 C01 - A509 RBT 1 Longitudinal Section Subway & Redway Ramps Sheet 2 Phase 1 Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29510 Rev C03 - LINK 501 CROSS SECTIONS SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01113-P01 - DMRB Compliant Drawing Eastern Link Roundabout 1 (EL RBT 1) Sheet 1 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29504 Rev C01 - LINK 504 CROSS SECTION SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-28305-P01 - Link 304 T3 Long Section CH 000.000m – CH 25.000m APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112013-P01 - Signage Layout Sheet 13 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28502 Rev C01 - LINK 502 LONG SECTION CH 000.000m - CH 50.000m [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29303 Rev C01 - LINK 303 CROSS SECTIONS [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-128113 Rev C01 - LINK 107 LONGITUDINAL SECTION CH 730.000m - CH 757.927m PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29146 Rev C01 - LINK 110 CROSS SECTION SHEET 4 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-604 Rev. C4 – Phase 1 HIF Landscape Planting Plan Page 4 of 5 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28307 Rev C01 - LINK 306 LONG SECTION CH 000.000m - CH 23.502m [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-EE-DR-101313 Rev. P01 - Phase 1 Highway Infrastructure, Proposed Street Lighting Layout (Sheet 13) APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01116 Rev C01 - DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-28070-P01 - Cranfield Link RBT Longitudinal Section Roundabout Approach Arms Sheet 3 of 3 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-28069-P01 - Cranfield Link RBT Longitudinal Section Roundabout Approach Arms Sheet 2 of 3 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28913 Rev C01- EASTERN LINK RBT 2 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112512-P01 - Road Marking Layout Sheet 12 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112030-P01 - Signage Layout Sheet 30 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112520-P01 - Road Marking Layout Sheet 20 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28114 Rev C01 - LINK 108 LONGITUDINAL SECTION CH 000.000m - CH 548.651 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28510 Rev C02 - LINK 501 LONGITUDINAL SECTION CH 600.000m - CH 788.366 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101310 Rev C02 - PROPOSED STREET LIGHTING LAYOUT SHEET 10 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28102 Rev C01 - LINK 102 LONG SECTION CH 000.000m - CH 455.490 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-129139 Rev C01 - LINK 108 CROSS SECTIONS SHEET 1 PHASE 1 INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112018 Rev C04 - SIGNAGE LAYOUT SHEET 18 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28060 Rev C01 - EL RBT 1 LONGITUDINAL SECTION ROUNDBOUT APPROACH ARMS SHEET 2 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28101 Rev C01 - LINK 101 LONG SECTION CH 000.000m - CH440.570m [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05204 Rev C01- ATTENUATION BASIN SECTIONS BASIN 15 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-632 rev C2 - PHASE 1 HIF SOILING PLAN PAGE 2 OF 5 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28056 Rev C01 - A509 RBT 1 LONGITUDINAL SECTION CH 000.000m - CH 179.071m SHEET 1 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01111-P01 - DMRB Compliant Drawing M1 J14 Roundabout 1 (M1 J14 RBT) Sheet 2 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01115-P01 - DMRB Compliant Drawing Eastern Link Roundabout 1 (EL RBT 1) Sheet 3 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01132 Rev C01 - DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 4 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112012-P01 - Signage Layout Sheet 12 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101320 Rev. P01 - Phase 1 Highway Infrastructure, Proposed Street Lighting Layout (Sheet 22) APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-601 Rev C3 - PHASE 1 HIF LANDSCAPE PLANTING PLAN PAGE 1 OF 5 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01119 Rev C01 - DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT 2) SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112513-P01 - Road Marking Layout Sheet 13 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-605 Rev. C4 - PHASE 1 HIF LANDSCAPE PLANTING PLAN PAGE 5 OF 5 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-128918 Rev C01 - A509 RBT 1 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 2 PHASE 1 INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29144 Rev C01 - LINK 110 CROSS SECTION SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-GE-DR-0662 - Earthwork Plan Sheet 12 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112014 Rev C03 - SIGNAGE LAYOUT SHEET 14 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112522-P02 - Road Marking Layout Sheet 22 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-DR-DR-105163 Rev C01 - PRIVATE-LLFA CUTOFF DITCH LONG SECTIONS SHEET 4 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-28304-P01 - Link 304 Long Section CH 000.000m – CH 151.145m APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28068 Rev C01 - CRANFIELD LINK RBT LONGITUDINAL SECTION CH 000.000m - CH 163.363m SHEET 1 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28912 Rev C01- EASTERN LINK RBT 2 LONGITUDINAL SECTION SUBWAY & REDWAY RAMPS SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-128113 - Link 107 Longitudinal Section CH 730.000m - CH 757.927m Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-DR-DR-105161 Rev C02 - PRIVATE-LLFA CUTOFF DITCHES LONG SECTIONS SHEET 2 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-503 Rev. C5 - PHASE 1 HIF LANDSCAPE GA PLAN PAGE 3 OF 5 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-128917 C01 - A509 RBT 1 Longitudinal Section Subway & Redway Ramps Sheet 1 Phase 1 Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112530-P01 - Road Marking Layout Sheet 30 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-502 Rev C3 - PHASE 1 HIF LANDSCAPE GA PLAN PAGE 2 OF 5 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28063 Rev C02 - A509 RBT 2 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 2 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-29305 P01 - Link 305 Cross Sections Sheet 1 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112015 Rev C04 - SIGNAGE LAYOUT SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-603 Rev. C4- PHASE 1 HIF LANDSCAPE PLANTING PLAN PAGE 3 OF 5 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101309 Rev C03 - PHASE 1 HIGHWAY INFRASTRUCTURE PROPOSED STREET LIGHTING LAYOUT SHEET 09 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29145 Rev C01 - LINK 110 CROSS SECTION SHEET 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05202 Rev C02 - ATTENUATION BASIN SECTIONS BASIN 9 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-28061-P01 - EL RBT 1 Longitudinal Section Roundabout Approach Arms Sheet 3 of 3 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28512 Rev C01 -LINK 512 LONGITUDINAL SECTION CH 000.000m - CH 23.757m [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112510 Rev C04 - ROAD MARKING LAYOUT SHEET 10 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01120 Rev C01 - DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT2) SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-128066 C01 - Eastern Link RBT 2 Longitudinal Section Roundabout Approach Arms Sheet 2 of 3 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01133-P01 - DMRB Compliant Drawing M1 J14 Roundabout 1 (M1 J14 RBT) Sheet 4 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-128066 Rev C01 - EASTERN LINK RBT 2 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 2 OF 3 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-129138 Rev C01 - LINK 107 CROSS SECTIONS PHASE 1 INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28062 Rev C01 - A509 RBT 2 LONGITUDINAL SECTION CH 000.00m - CH 116.239m SHEET 1 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01122-P01 - DMRB Compliant Drawing Cranfield Link (CL RBT) Sheet 1 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-129108 Rev C01 - LINK 103 CROSS SECTIONS SHEET 1 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01135 Rev C01 - DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 4 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-504 Rev. C4 - PHASE 1 HIF LANDSCAPE GA PLAN PAGE 4 OF 5 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112010 Rev C03 - SIGNAGE LAYOUT SHEET 10 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28059 Rev C01 - EASTERN LINK RBT 1 LONGITUDINAL SECTION CH 000.000m - CH 163.363m SHEET 1 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-128103 Rev C01 - LINK 103 LONG SECTION CH 000.00m - CH 25.000m SHEET 1 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28501 Rev C02 - LINK 501 LONG SECTION CH 000.000m - CH 600.000m [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01137-P01 - DMRB Compliant Drawing Cranfield Link Roundabout (CL RBT) Sheet 4 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29509 Rev C01 - LINK 509 CROSS SECTIONS [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-EE-DR-101338 Rev. P01 - Phase 1 Highway Infrastructure, Proposed Street Lighting Layout (Sheet 30) APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-GE-DR-0671 - Earthwork Plan Sheet 21 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01107 Rev C01 - DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 1[N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28065 Rev C01 - EASTERN LINK RBT 2 LONGITUDINAL SECTION CH 000.000m - CH 179.071m SHEET 1 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112009 Rev C05 - SIGNAGE LAYOUT SHEET 09 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28503 - Rev C01 - LINK 503 LONG SECTION CH 000.000m - CH 101.135m [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101319 Rev C03 - PHASE 1 HIGHWAY INFRASTRUCTURE PROPOSED STREET LIGHTING LAYOUT SHEET 19 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-354 Rev C3 - Soiling Sections 5 of 8 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28057 Rev C01 - A509 RBT 1 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 2 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01108 Rev C01 - DMRB COMPLIANT DRAWING A509 ROUNDABOUT 1 (A509 RBT 1) SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29511 Rev C01 - LINK 511 CROSS SECTIONS [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29107 Rev C02 - LINK 102 CROSS SECTION SHEET 3 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28504 Rev C01 - LINK 504 LONG SECTION CH 000.000m - CH 60.000m [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-GE-DR-0663 - Earthwork Plan Sheet 13 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-635 Rev. C4 - Phase 1 HIF Soiling Plan 5 of 5 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-631 Rev C2 - PHASE 1 HIF SOILING PLAN PAGE 1 OF 5 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-GE-DR-0612-P03 - Overall Preliminary Ground Improvement Location Plan APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29105 Rev C01 - LINK 102 CROSS SECTION SHEET 1 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-634 Rev. C4 - Phase 1 HIF Soiling Plan 4 of 5 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28064 Rev C02 - A509 RBT 2 LONGITUDINAL SECTION ROUNDABOUT APPROACH ARMS SHEET 3 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01110-P01 - DMRB Compliant Drawing M1 J14 Roundabout Sheet 1 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01121 Rev C01 - DMRB COMPLIANT DRAWING A509 ROUNDABOUT 2 (A509 RBT2) SHEET 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-DR-DR-05214 Rev C01 - ATTENUATION BASIN SECTIONS POND 18-2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112017 Rev C04 - SIGNAGE LAYOUT SHEET 17 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28085 Rev C01 - MAINTENANCE LAYBY LONGITUDINAL SECTIONS SHEET 2 OF 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29106 Rev C02 - LINK 102 CROSS SECTION SHEET 2 OF 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28118 Rev C01 - LINK 110 LONG SECTION CH 000.000m - CH 553.555 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-28302 Rev C01 - LINK 302 LONG SECTION CH 000.000m - CH 208.894m [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112022-P01 - Signage Layout Sheet 22 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101318 Rev C03 - PHASE 1 HIGHWAY INFRASTRUCTURE PROPOSED STREET LIGHTING LAYOUT SHEET 18 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01117 Rev C01 - DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01118 Rev C01 - DMRB COMPLIANT DRAWING EASTERN LINK ROUNDABOUT 2 (EL RBT 2) SHEET 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112020-P01 - Signage Layout Sheet 20 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-EE-DR-101312 Rev. P01 - Phase 1 Highway Infrastructure, Proposed Street Lighting Layout (Sheet 12) APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01124-P01 - DMRB Compliant Drawing Cranfield Link (CL RBT) Sheet 3 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-EE-DR-101317 Rev C03 - PHASE 1 HIGHWAY INFRASTRUCTURE PROPOSED STREET LIGHTING LAYOUT SHEET 17 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-29101-P01 - Link 101 Cross Sections Sheet 1 of 4 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-29501 Rev C03 - LINK 501 CROSS SECTION SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗

Other documents 248

PDF X681-HTA01-MK01-XX-DR-L-810-201 Rev C3 - SOFT LANDSCAPE DETAILS 2 OF 2 [N] APPCONIN - Condition Submitted Details · 26 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-03017 Rev C06 - FENCING SHEET 17 [N] APPCONIN - Condition Submitted Details · 26 Aug 2026 View ↗ PDF Cover Letter - 70958/01/MS/MG/41531103v1 (Phase 1 SHI) - 26/08/2026 APPSUPP - Other Supporting Documents/Information · 26 Aug 2026 View ↗ PDF MKE-WSP-P1-01-EE-DR-101479 P01- Phase 1 Highway Infrastructure Proposed Electrical Details - Setting Out Detail Sheet 79 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11070-P01 - Kerbing Sheet 20 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07100 Rev C01 - PAVEMENT CONSTRUCTION DETAILS SHEET 5 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11063-P01 - Kerbing Sheet 13 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-03094 Rev C04 - FENCING CONSTRUCTION DETAILS SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112810 Rev C03 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 10 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01337-P01 - Link 304 Link 110 Box Van Junction Tracking APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11012 P01 - FOOTWAYS AND PAVED AREAS SHEET 12 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11021-P01 - Footways and Paved Areas Sheet 21 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112830-P01 - Traffic Sign Construction Detail Sheet 30 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02018 Rev C03 - SITE CLEARANCE SHEET 18 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-27999 Rev C03 - CONTOUR KEY AND NOTES [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02010 Rev C02 - SITE CLEARANCE SHEET 10 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07018 Rev C07 - PAVEMENT AND SURFACING SHEET 18 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-03022-P01 - Fencing Sheet 22 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-03010 Rev C04 - FENCING SHEET 10 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-EE-DR-101480 P01- Phase 1 Highway Infrastructure Proposed Electrical Details - Setting Out Detail Sheet 80 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01310 Rev C01 - LINK 108 - 511 BUS STOP TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-EE-DR-101407 -P01- Phase 1 Highway Infrastructure Proposed Electrical Details - Setting Out Detail Sheet 07 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01342 Rev C01 - LINK 110, LINK 503 BOX VAN JUNCTION TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-EE-DR-101409 P01- Phase 1 Highway Infrastructure Proposed Electrical Details - Setting Out Detail Sheet 09 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01341 Rev C01 - LINK 110, LINK 503 REFUSE VEHICLE JUNCTION TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07011 Rev C05 - PAVEMENT AND SURFACING SHEET 11 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01641-P01 - EL RBT 1 Subway Contours APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01051 Rev C01 - GENERAL ARRANGEMENT PRIMARY SUBSTATION [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07019 Rev C04 - PAVEMENT AND SURFACING SHEET 19 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01205-P01 - Junction Visibility Eastern Link Roundabout 1 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-EE-DR-101411 P01- Phase 1 Highway Infrastructure Proposed Electrical Details - Setting Out Detail Sheet 11 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11098 Rev C05 - KERBING AND FOOTWAY STANDARD DETAILS SHEET 5 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01030-P01 - General Arrangement Sheet 30 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-03021-P01 - Fencing Sheet 21 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112899 Rev C02 - TRAFFIC SIGNS CONSTRUCTION DETAILS SIMMONSIGN UPLIGHTER PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01343 Rev C01 - LINK 110, LINK 503 FIRE TENDER JUNCTION TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-GE-DR-0618-P03- Preliminary Ground Improvement Extents Sheet 6 of 6 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01054 Rev C02 - GENERAL ARRANGEMENT TYPICAL SUBSTATION [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01649 Rev C01 - EASTERN LINK ROUNDABOUT 2 SUBWAY- CONTOURS [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-04017 Rev C01 - VEHICLE RESTRAINT SYSTEM SHEET 17 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01204-P01 - Junction Visibility M1 J14 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-07021-P01 - Pavement and Surfacing Sheet 21 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01301 Rev C01 - LINK 108 - 511 AND 108 - 512 THROUGH JUNCTION TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-03014 Rev C01 - FENCING SHEET 14 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02026 Rev C02 - SITE CLEARANCE SHEET 26 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07092 Rev C01 - PAVEMENT CONSTRUCTION DETAILS ON STRUCTURES SHEET 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01219-P01 - Junction Visibility Cranfield Link (CL RBT) APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01052 Rev P01 - GENERAL ARRANGEMENT PYMS SUB STATION [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01378-P01 - Newport Road Turning Head Tracking APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07099 Rev C03 - PAVEMENT CONSTRUCTION DETAILS SHEET 6 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-03012-P01 - Fencing Sheet 12 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-27019 Rev C04 - PROPOSED CONTOURS SHEET 19 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01318 Rev P02 - ROUNDABOUT MAINTENANCE LAYBY VEHICLE TRACKING SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-04012-P01 - Vehicle Restraint System Sheet 12 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07096 Rev C02 - PAVEMENT CONSTRUCTION DETAILS SHEET 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02011 Rev C03 - SITE CLEARANCE SHEET 11 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07090 Rev C01 - PAVEMENT CONSTRUCTION DETAILS ON STRUCTURES SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-03019 Rev C04 - FENCING SHEET 19 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11017 Rev C07 FOOTWAYS AND PAVED AREAS SHEET 17 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01206 Rev C01 - JUNCTION VISIBILITY EASTERN LINK ROUNDABOUT 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01311 Rev C01 - HGV - VEHICLE TRACKING A509 ROUNDABOUT 1 LINK 108, LINK 509, LINK 510 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-27013 P01 - Proposed Contours Sheet 13 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11014 Rev C01 - FOOTWAYS AND PAVED AREAS SHEET 14 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01021-P01 - General Arrangement Sheet 21 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-101234 - Rev P01 - JUNCTION VISIBILITY LINK 501 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11094 Rev C03 - KERBING AND FOOTWAY STANDARD DETAIL SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-04021-P01 - Vehicle Restraint System Sheet 21 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11062-P01 - Kerbing Sheet 12 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112999 Rev C02 - SIGNS AND LINES KEY AND NOTES PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01338-P01 - Link 304 Link 110 Fire Tender Junction Tracking APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112819 Rev C03 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 19 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11060 Rev C03 - KERBING SHEET 10 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-27022 P01 - Contours Sheet 22 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01226 Rev C01 - EL RBT 2 ROUNDABOUT VISIBILITY [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02027 Rev C02 - SITE CLEARANCE SHEET 27 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112817 Rev C03 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 17A PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01395-P01 - HGV and Box Van Cranfield Roundabout Junction Tracking APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11061 Rev C03 - KERBING SHEET 11 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-07013-P01 - Pavement and Surfacing Sheet 13 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01307 Rev C01 - LINK 511 REFUSE VEHICLE TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF 2026-07-27_MKE - Strategic Highways Infrastructure (Package 1) - APPENDIX E - REV A - Part 1 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-07030 P01 - Pavement and Surfacing Sheet 30 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-102015 Rev C01 - SITE CLEARANCE SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11097 Rev C02 - KERBING AND FOOTWAY STANDARD DETAILS SHEET 4 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-03011 Rev C04 - FENCING SHEET 11 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07102 Rev P01 - PAVEMENT CONSTRUCTION DETAILS SHEET 7 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-111065 Rev C03 - KERBING SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01017 Rev C06 - GENERAL ARRANGEMENT SHEET 17 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11010 Rev C04 - FOOTWAYS AND PAVED AREAS SHEET 10 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07094 Rev C01 - PAVEMENT CONSTRUCTION DETAILS SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11029 Rev C01 - FOOTWAYS AND PAVED AREAS SHEET 29 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF 2026-07-27_MKE - Strategic Highways Infrastructure (Package 1) - APPENDIX C - REV A - Part 2 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-03030-P01 - Fencing Sheet 30 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-BCA-ELS-XX-RP-L- 2493-25-S5-RP01-P12 - SOFT LANDSCAPE WORKS MAINTENANCE AND MANAGEMENT PROPOSALS – 5 YEARS APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01303 Rev C01 - LINK 512 BOX VAN TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01233-P01 - Cranfield Link (CL RBT) Roundabout Visibility APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11030-P01 - Footways and Paved Areas Sheet 30 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112815 Rev C02 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 15A PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01312 Rev C01 - BOX VAN - VEHICLE TRACKING A509 ROUNDABOUT 1 LINK 108, LINK 509, LINK 510 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11067 Rev C06 - KERBING SHEET 17 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01339-P01 - Link 304 Link 110 HGV Junction Tracking APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11080-P01 - Kerbing Sheet 30 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-03018 Rev C05 - FENCING SHEET 18 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01306 Rev C01 - LINK 511 BUS STOP AND THROUGH JUNCTION TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01209-P01 - Junction Visibility Link 503 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-127009 Rev C03 - PROPOSED CONTOURS SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF 2026-07-24_MKE - Strategic Highways Infrastructure (Package 1) - APPENDIX A - REV A_compressed APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-27010 Rev C04 - PROPOSED CONTOURS SHEET 10 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01207 Rev C01 - JUNCTION VISIBILITY A509 ROUNDABOUT 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01331 Rev C01 - HGV - VEHICLE TRACKING EASTERN LINK ROUNDABOUT 2, LINK 102, LINK 502 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-104015 Rev C02 - VEHICLE RESTRAINT SYSTEM SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02000 Rev C03 - SITE CLEARANCE NOTES AND KEY [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF 2026-07-27_MKE - Strategic Highways Infrastructure (Package 1) - APPENDIX C - REV A - Part 3 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01225-P01 - EL RBT 1 Roundabout Visibility APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01013-P01 - General Arrangement Sheet 13 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01304 Rev C01 - LINK 512 REFUSE VEHICLE TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01309 Rev C01 - LINK 511 FIRE VEHICLE TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-03013-P01 - Fencing Sheet 13 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112912 Rev C02 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 12B PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01214 Rev C01 - JUNCTION VISIBILITY LINK 306 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112820 Rev C03 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 20 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112812 - Rev C02 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 12A PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-EMP-XX-HW-DR-00006B-P03 - Planning Application Boundaries (amended 30/7/26) with Parcel Plot Boundaries APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01010 Rev C04 - GENERAL ARRANGEMENT SHEET 10 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07017 Rev C07 - PAVEMENT AND SURFACING SHEET 17 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07999 Rev C05 - PAVEMENT KEY AND NOTES [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01363 Rev C01 - LINK 102 15m BUS BUS STOP TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-101009 Rev C04 - GENERAL ARRANGEMENT SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-101015 Rev C03 - GENERAL ARRANGEMENT SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11022-P01 - Footways and Paved Areas Sheet 22 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-107009 Rev C03 - PAVEMENT AND SURFACING SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11069 Rev C04 - KERBING SHEET 19 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-GE-DR-0613-P03- Preliminary Ground Improvement Extents Sheet 1 of 6 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01018 Rev C06 - GENERAL ARRANGEMENT SHEET 18 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01073 Rev C01 - GENERAL ARRANGEMENT SUB STATION [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112913 Rev C01 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 13B PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01305 Rev C01 - LINK 108 - 512 BUS STOP TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01074 Rev C01 - GENERAL ARRANGEMENT SUB STATION 5 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-27029 Rev C01- PROPOSED CONTOURS SHEET 29 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07097 Rev C02 - PAVEMENT CONSTRUCTION DETAILS SHEET 4 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112899 C02 - Traffic Signs Construction Details Simmonsign Uplighter Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-112822-P01 - Traffic Signs Construction Details Sheet 22A Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01230 Rev C01 - A509 RBT 2 ROUNDABOUT VISIBILITY [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07010 Rev C05 - PAVEMENT AND SURFACING SHEET 10 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-127015 Rev C02 - PROPOSED CONTOURS SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-27014 Rev C01 - PROPOSED CONTOURS SHEET 14 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-04018 Rev C01 - VEHICLE RESTRAINT SYSTEM SHEET 18 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01014 Rev C01 - GENERAL ARRANGEMENT SHEET 14 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01317 Rev P04 - ROUNDABOUT MAINTENANCE LAYBY VEHICLE TRACKING SHEET 1 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01202 Rev C01 - JUNCTION VISIBILITY LINK 511 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-04013-P01 - Vehicle Restraint System Sheet 13 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11095 Rev C01 - KERBING AND FOOTWAY STANDARD DETAILS SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-27011 Rev C04 - PROPOSED CONTOURS SHEET 11 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02017 Rev C03 - SITE CLEARANCE SHEET 17 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01634 Rev P04 - A509 RBT 1 SUBWAY- FOOTWAYS AND PAVED AREAS PHASE 2 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01208-P01 - Junction Visibility Link 304 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112811 Rev C04 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 11A PHASE 2 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02025 Rev C02 - SITE CLEARANCE SHEET 25 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-04014 Rev C01 - VEHICLE RESTRAINT SYSTEM SHEET 14 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01012-P01 - General Arrangement Sheet 12 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-EE-DR-101413 P01- Phase 1 Highway Infrastructure Proposed Electrical Details - Setting Out Detail Sheet 13 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01223 Rev C01 - LINK 108 PUMPING STATION ACCESS JUNCTION VISIBILITY [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01999 Rev C04 - GENERAL ARRANGEMENT, VISIBILITY AND RBT COMPLIANCE KEY AND NOTES [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112809 Rev C05 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 9A PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112818 Rev C03 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 18 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01642-P01 - EL RBT 1 Subway Footway and Paved Area APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01201 Rev C01 - JUNCTION VISIBILITY LINK 512 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11019 Rev C04 - FOOTWAYS AND PAVED AREAS SHEET 19 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112814 Rev C03 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 14A PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01020-P01 - General Arrangement Sheet 20 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01203 Rev C01 - JUNCTION VISIBILITY A509 ROUNDABOUT [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-104009 Rev C04 - VEHICLE RESTRAINT SYSTEM SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-03999 Rev C06 - FENCING KEY AND NOTES [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11071-P01 - Kerbing Sheet 21 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01071 Rev C01 - GENERAL ARRANGEMENT SUB STATION 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02029 Rev C02 - SITE CLEARANCE SHEET 29 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07014 Rev C01 - PAVEMENT AND SURFACING SHEET 14 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07095 Rev C04 - PAVEMENT CONSTRUCTION DETAILS SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01316-P01 - M1 Junction 14 Roundabout Link 101 Vehicle Tracking APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-07091 Rev C01 - PAVEMENT CONSTRUCTION DETAILS ON STRUCTURES SHEET 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01022-P01 - General Arrangement Sheet 22 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-111009 Rev C03 - FOOTWAYS AND PAVED AREAS SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-02020-P01 - Site Clearance Sheet 20 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11096 Rev C04 - KERBING AND FOOTWAY STANDARD DETAILS SHEET 3 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11068 Rev C05 - KERBING SHEET 18 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11011 Rev C04 - FOOTWAYS AND PAVED AREAS SHEET 11 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11018 Rev C06 - FOOTWAYS AND PAVED AREAS SHEET 18 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-02022-P01 - Site Clearance Sheet 22 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-102009 Rev C01 - SITE CLEARANCE SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-04999 Rev C03 - VEHICLE RESTRAINT SYSTEM KEY AND NOTES [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF 2026-07-27_MKE - Strategic Highways Infrastructure (Package 1) - APPENDIX C - REV A - Part 1 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01321-P01 - HGV Vehicle Tracking Eastern Link Roundabout 1 Link 101 Link 102 Link 301 Link 302 Sheet 1 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01308 Rev C01 - LINK 511 BOX VAN TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11013-P01 - Footways and Paved Areas Sheet 13 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-200 rev C3 - SOFT LANDSCAPE DETAILS 1 OF 2 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-27018 Rev C06 - PROPOSED CONTOURS SHEET 18 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11020-P01 - Footways and Paved Areas Sheet 20 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-GE-DR-0619-P03 - Earthworks Plans Schematic Overview APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-107015 Rev C01 - PAVEMENT AND SURFACING SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF 12491_04 MKE Conditions Tracker 31-07-26 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01322-P01 - HGV Vehicle Tracking Eastern Link Roundabout 1 Link 101 Link 102 Link 301 Link 302 Sheet 2 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01326 Rev C01 - HGV - VEHICLE TRACKING A509 ROUNDABOUT 2, LINK 302, LINK 303, LINK 501 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01053 Rev C01 - GENERAL ARRANGEMENT HEALTH HUB - LINK 108 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-04020-P01 - Vehicle Restraint System Sheet 20 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-27030 P01 - Contours Sheet 30 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-112813 Rev C03 - TRAFFIC SIGNS CONSTRUCTION DETAILS SHEET 13A PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-02012-P01 - Site Clearance Sheet 12 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01639 Rev C01 - A509 RBT 1 SUBWAY [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01094 Rev C06 - TYPICAL BUS STOP DETAIL [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF X681-HTA01-MK01-XX-DR-L-810-613 Rev C2 - Phase 1 HIF - Roundabout Planting Plans [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02014 Rev C02 - SITE CLEARANCE SHEET 14 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01011 Rev C04 - GENERAL ARRANGEMENT SHEET 11 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02024 Rev C01 - SITE CLEARANCE SHEET 24 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-07022-P01 - Pavement and Surfacing Sheet 22 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-04022-P01 - Vehicle Restraint System Sheet 22 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-128067 C01 - Eastern Link RBT 2 Longitudinal Roundabout Approach Arms Sheet 3 of 3 Phase 1 Highway Infrastructure APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01229 Rev C01 - A509 RBT 1 ROUNDABOUT VISIBILITY [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01650 Rev C01 - EASTERN LINK ROUNDABOUT 2 SUBWAY- FOOTWAYS AND PAVED AREAS [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01224 Rev C01 - LINK 510 PUMPING STATION ACCESS JUNCTION VISIBILITY [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02019 Rev C03 - SITE CLEARANCE SHEET 19 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-02030-P01 - Site Clearance Sheet 30 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01029 Rev C02 - GENERAL ARRANGEMENT SHEET 29 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01336-P01 - Link 304 Link 110 Refuse Vehicle Junction Tracking APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-07012-P01 - Pavement and Surfacing Sheet 12 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-103009 Rev C03 - FENCING SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01364 Rev C01 - LINK 102 ARTICULATED BUS BUS STOP TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-11072-P01 - Kerbing Sheet 22 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-02021-P01 - Site Clearance Sheet 21 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01633 Rev C01 - A509 RBT 1 SUBWAY- CONTOURS [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-02013-P01 - Site Clearance Sheet 13 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-03029 Rev C02 - FENCING SHEET 29 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-111015 Rev C03 - FOOTWAYS AND PAVED AREAS SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11999 Rev C05 - FOOTWAYS AND PAVED AREAS AND KERBING KEY AND NOTES [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-11064 Rev C01 - KERBING SHEET 14 [N} APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF 2026-07-27_MKE - Strategic Highways Infrastructure (Package 1) - APPENDIX E - REV A - Part 2 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01019 Rev C06 - GENERAL ARRANGEMENT SHEET 19 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02023 Rev C01 - SITE CLEARANCE SHEET 23 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-01000-P01 - Schematic Overview APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-27017 Rev C05 - PROPOSED CONTOURS SHEET 17 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-01302 Rev C01 - LINK 512 REFUSE VEHICLE TRACKING [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-27012 P01 - Proposed Contours Sheet 12 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-27021 P01 - Proposed Contours Sheet 21 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-03020-P01 - Fencing Sheet 20 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-111059 Rev C04 - KERBING SHEET 9 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-IN-CH-DR-103015 Rev C01 - FENCING SHEET 15 PHASE 1 HIGHWAY INFRASTRUCTURE [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-07020-P01 - Pavement and Surfacing Sheet 20 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-ZZ-ZZ-CH-DR-02028 Rev C02 - SITE CLEARANCE SHEET 28 [N] APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗ PDF MKE-WSP-P1-01-CH-DR-27020 P01 - Proposed Contours Sheet 20 APPCONIN - Condition Submitted Details · 6 Aug 2026 View ↗

All documents on the council site ↗

Associated applications 15

Site constraints 2

Article 4 direction
Article 4 Direction relating to Houses in Multiple Occupation (HIMO) - Non immediate direction. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Milton Keynes - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of details reserved by a condition
Postcode
MK16 0JA
Received
4 Aug 2026
Validated
26 Aug 2026
Ward
Broughton & Moulsoe;Campbell Park & Willen;Great Linford
Parish
Broughton and Milton Keynes;Campbell Park;Great Linford;Moulsoe;Newport Pagnell
Case officer
Show
Target decision
21 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Lichfields - Michelle Gan

Public comments

1comment received
1 neutral

Last counted 9 Sept 2026

Read the comments on the council site ↗

Milton Keynes
Planning Authority Score
7.1/10
Good
#59 of 296 councils
Relevant to this application:
Major dwellings

Milton Keynes is faster than most councils at deciding householder applications, ranking #52 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Milton Keynes decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #156 of 296
92%
Householder approved
Above avg (90%) #159 of 296
78%
Decided in 8 weeks
Above avg (63%) #52 of 296
28%
Extended time limit
Below avg (41%) #45 of 296
55%
Minor dwellings approved
66 decided (1-9 homes)
83%
Major dwellings approved
23 decided (10+ homes)
71%
Change of use approved
49 decided
1,088
Total decisions
134 refused in the year to March 2026