National Library Of Wales National Library Access, Penglais, Aberystwyth, SY23 3BU Data via plota.co.uk

A260457 - Listed Building Consent In Progress

Proposal

The objective of the proposal is to improve the external access to the National Library by widening the current steps. The works are modest in nature and only involve a small modification. The intention is simply to increase the width of the three steps by; removing an existing granite dwarf wall, placing new risers along the existing recess and repositioning an existing handrail and guardrail. The ramped access is to remain unaltered. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Jul 2026
✓
Validated
20 Aug 2026
Decision
Target date was 15 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 69.

The consultation period closed on 28 Sept 2026.

Site constraints 4

Grade II* listed: National Library of Wales
List entry 10417 · 2 m away
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Cadw ↗
Registered park or garden: University of Wales, Aberystwyth: Plas Penglais, P
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Also on the record
Radon affected area, class 2; Local nature reserve 488 m away: Penglais.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ceredigion - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ceredigion
Application type
Listed Building Consent
Postcode
SY23 3BU
Received
8 Jul 2026
Validated
20 Aug 2026
Case officer
Show
Target decision
15 Oct 2026
Decision level
Dirprwyedig / Delegated
Applicant
Show
Agent
DB3 Architecture (Aberystwyth Office)
Leaseholder
Show

Decision outlook

Day 69, past the statutory target. 73% of extensions in Ceredigion are decided within thirteen weeks, which runs to 19 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 27 Oct 2026.

Day 6913 days past the 56-day target
55%decided within 8 weeks
85%approved
240decided in the last year

Plota live figures for extensions decided by Ceredigion in the last twelve months, from validation. Ceredigion decision record →

Consultation & key dates

Comments by
28 Sept 2026
Statutory expiry
15 Oct 2026

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.