Brass Castle Farm Waldridge Chester-le-Street DH2 3SL Data via plota.co.uk

DM/26/02176/FPA - Full Planning Application Pending Consideration

Proposal

Side extension Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
18 Aug 2026
Validated
27 Aug 2026
Consultation
3 Sept 2026
Decision
Expected by 22 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 20 Oct 2026, from Durham's recent extensions. Comments are open until 24 Sept 2026.

Comment on this application ↗

Site constraints 7

Green belt: Tyne and Wear
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm.
Public bridleway 19 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
SSSI 14 m away: Waldridge Fell SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Priority habitat 9 m away: Deciduous woodland; Open access land 14 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land. MoD Byelaw, Section 28 Exclusions, Racecourses and Aerodromes and ECP Margin have been removed.; the 1970s provisional farmland map had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Durham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Durham
Application type
Full Planning Application
Postcode
DH2 3SL
Received
18 Aug 2026
Validated
27 Aug 2026
Ward
Chester-le-Street South
Parish
Waldridge
Case officer
Show
Target decision
22 Oct 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 19 of the 56-day target. Durham usually decides extensions by day 54.

Day 1937 days to the 56-day target
74%decided within 8 weeks
98%approved
465decided in the last year

Plota live figures for extensions decided by Durham in the last twelve months, from validation. Durham decision record →

Public comments

No public comments yet.

Last counted 4 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15167813
Consultation
3 Sept 2026
Comments by
24 Sept 2026
Env. assessment
No
Durham
Planning Authority Score
5.2/10
Average
#137 of 296 councils
Relevant to this application:
Householder decisions

Durham ranks #190 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Durham decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #52 of 296
97%
Householder approved
Above avg (90%) #29 of 296
59%
Decided in 8 weeks
Below avg (63%) #190 of 296
48%
Extended time limit
Above avg (41%) #213 of 296
79%
Minor dwellings approved
95 decided (1-9 homes)
90%
Major dwellings approved
49 decided (10+ homes)
87%
Change of use approved
201 decided
1,706
Total decisions
113 refused in the year to March 2026