Church Farm The Street Winfarthing Norfolk IP22 2ED Data via plota.co.uk

2025/3899 - Removal/Variation of Condition Refused

Proposal

Variation/removal of conditions 4 5 & 6 - (4) Habitat Management and Monitoring Plan (HMMP) (5) Implementation of Habitat Management Plan & (6) Submission of BNG Monitoring reports. Remove BNG requirement for on-site/off-site enhancements on planning permission (which consented to New 50kW (115 panels) photovoltaic array) Date of Decision: 06/05/2025 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Dec 2025
✓
Validated
14 Jan 2026
✓
Consultation
10 Feb 2026
✗
Refused
13 Mar 2026
Appeal
Not lodged

Refused on 13 Mar 2026 · Delegated · Last checked 7 Jul 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive
    • VariationVariation/removal of conditions 4 5 & 6 - (4) Habitat Management and Monitoring Plan (HMMP)…RefusedThis application2025/3899

Site constraints 5

5 listed buildings within 150 m of the postcode pin
Nearest: 1 and 2, the Street, Grade II, about 8 m from the postcode pin · 5 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic England ↗
Winfarthing Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 622 m away: Norwich to Tilbury
The site is about 622 m from the project boundary. Electricity line, examination closed, recommendation due.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Priority habitat about 28 m away: No main habitat but additional habitats present.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £455,000 in June 2019. Detached house, freehold.

27 June 2019£455,000
16 December 2005£360,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Removal/Variation of Condition
Postcode
IP22 2ED
Received
17 Dec 2025
Validated
14 Jan 2026
Ward
Bressingham And Burston
Parish
Winfarthing
Case officer
Show
Target decision
11 Mar 2026
Decision
Refusal
Decision date
13 Mar 2026
Decision level
Delegated
Applicant
Show
Agent
KFD Architecture

Consultation & key dates

Alt. reference
PP-14566816
Planning Portal ref
PP-14566816
Neighbours
22 Jan 2026
Consultation
10 Feb 2026
Comments by
5 Mar 2026
Site or press notice
12 Feb 2026
Statutory expiry
11 Mar 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Householder decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026