Stadium Retail Park, Wembley Park Drive, Wembley, HA9 8TS (Former Land adjoining Fountain Television Studio… Data via plota.co.uk

25/3383 - Non-material amendments Approved

Proposal

Non-material amendment to description of development and wording of condition 6 (general food retailing shall be carried out within unit 3 only) of Full Planning Permission reference dated 20 February, 1998, for Erection of a new Class A1 retail development including the addition of a Food Retail unit of 1200 square metres Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Dec 2025
✓
Approved
9 Jan 2026

Approved on 9 Jan 2026 · Delegated Team Manager · Last checked 5 Oct 2026

Associated applications 3

Site constraints 6

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Wembley Park
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Brent built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Non-material amendments
Postcode
HA9 8TS
Received
5 Dec 2025
Validated
5 Dec 2025
Ward
Wembley Park
Case officer
Show
Target decision
9 Jan 2026
Decision
Permission Granted
Decision date
9 Jan 2026
Decision level
Delegated Team Manager
Applicant
Show
Agent
CarneySweeney Planning

Public comments

No public comments yet.

Last counted 5 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14529950
Planning Portal ref
PP-14529950
Comments by
29 Dec 2025
Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026