Land at, Main Street, Torksey, Lincoln, LN1 2EE Data via plota.co.uk

WL/2026/00617 - Telecomms Determin. - 28 days Approved

Proposal

The Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) – Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus. Installation of subtended Headend Sidepod onto existing BT cabinet. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Jul 2026
✓
Approved
4 Aug 2026

Approved on 4 Aug 2026 · Delegated · Last checked 5 Sept 2026

Site constraints 7

Radon-affected area
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Scheduled monument 28 m away: Site of medieval town
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon-affected areaCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
National infrastructure project 1172 m away: Tillbridge Solar Project; Heritage at risk 28 m away: Site of medieval town.
Not affected
Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Telecomms Determin. - 28 days
Postcode
LN1 2EE
Received
9 Jul 2026
Validated
9 Jul 2026
Ward
TORKSEY
Parish
Torksey CP
Case officer
Show
Target decision
6 Aug 2026
Decision
No observation/objections
Decision date
4 Aug 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 26 days from validation, about the council's usual 26 days. Approved, as 100% of utility and infrastructure works here are.

96%decided within 8 weeks
100%approved
31decided in the last year

Plota live figures for utility and infrastructure works decided by West Lindsey in the last twelve months, from validation. West Lindsey decision record →

Consultation & key dates

Alt. reference
EC/2026/00644
Committee
9 Jul 2026
Statutory expiry
6 Aug 2026
Env. assessment
No
West Lindsey
Planning Authority Score
5.3/10
Average
#134 of 296 councils
Relevant to this application:
Householder decisions

West Lindsey ranks #110 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
West Lindsey decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #70 of 296
94%
Householder approved
Above avg (90%) #123 of 296
72%
Decided in 8 weeks
Above avg (63%) #110 of 296
44%
Extended time limit
Above avg (41%) #187 of 296
88%
Minor dwellings approved
80 decided (1-9 homes)
100%
Major dwellings approved
25 decided (10+ homes)
94%
Change of use approved
33 decided
562
Total decisions
39 refused in the year to March 2026