Land East Of Coventry Lane (west Of Moor Lane) Bramcote Nottinghamshire Data via plota.co.uk

25/00553/VOC - Variation of Condition Application Approved

Proposal

Variation of conditions 2 (approved plans), 6 (materials), 7 (piling), 8 (CMP), 9 (Archaeology), 12 (play equipment details), 14 (LEMP), 15 (CEMP), and 16 (Badger survey) of planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Jul 2025
✓
Validated
26 Jul 2025
✓
Consultation
7 Aug 2025
✓
Approved
13 Oct 2025

Approved on 13 Oct 2025 · Planning Committee · Last checked 14 Oct 2026

Planning committee

Decided by Broxtowe Planning Committee on 8 Oct 2025.

Approved

As officers recommended.

  • Officers advised approval because the changes were acceptable and would retain the approved housing numbers and development aims.
  • Residents raised concerns about flooding, hedges, construction disturbance, wildlife and the loss of a historic pond.
  • The Committee approved the application after debating drainage, hedgerows and builders’ access.
Read how the committee decided The proposed changes, site history, officer assessment, public comments, committee debate, vote and decision.

Source: Plota analysis of Broxtowe's committee minutes of 8 Oct 2025.

Site constraints 3

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: 50 m away (reference 450339-038).
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Local nature reserve 359 m away: Nottingham Canal.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 14 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Broxtowe - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Broxtowe
Application type
Variation of Condition Application
Received
25 Jul 2025
Validated
26 Jul 2025
Ward
Bramcote
Parish
Bramcote Neighbourhood Forum
Case officer
Show
Target decision
25 Oct 2025
Decision
Conditional Permission
Decision date
13 Oct 2025
Decision level
Planning Committee
Applicant
Show

Public comments

2comments received
2 objecting

47 neighbours consulted · Last counted 14 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14200844
Planning Portal ref
PP-14200844
Neighbours
8 Aug 2025
Consultation
7 Aug 2025
Comments by
30 Aug 2025
Site or press notice
5 Aug 2025
Statutory expiry
25 Oct 2025
Env. assessment
No
Broxtowe
Planning Authority Score
8.4/10
Excellent
#16 of 296 councils
Relevant to this application:
Householder decisions

Broxtowe is faster than most councils at deciding householder applications, ranking #48 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Broxtowe decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #35 of 296
96%
Householder approved
Above avg (90%) #52 of 296
78%
Decided in 8 weeks
Above avg (63%) #48 of 296
29%
Extended time limit
Below avg (41%) #48 of 296
83%
Minor dwellings approved
42 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
92%
Change of use approved
36 decided
479
Total decisions
29 refused in the year to March 2026