Car Park at 64, Greenwich Park Street, Greenwich, SE10 9LT Data via plota.co.uk

25/3682/MA - Submission of Details 8 Weeks Approved

Proposal

An application submitted under Section 73 of the Town & Country Planning Act 1990 for a minor material amendment in connection with the planning permission dated 24/06/2025 for the 'Construction of 4 x three bedroom houses with private gardens, terraces on upper floors, associated communal amenity space, refuse storage areas, cycle parking and biodiversity improvements' to allow: Variation of Condition 2 (Drawing Numbers) - To reduce the footprint of House 1 (to maintain a clear distance from the Network Rail boundary). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Nov 2025
✓
Validated
18 Nov 2025
✓
Consultation
20 Nov 2025
✓
Approved
13 Jan 2026

Approved on 13 Jan 2026 · Delegation · Last checked 16 Oct 2026

Documents 28

All documents on the council site ↗

Associated applications 4

Site constraints 12

Blackheath conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 115 m away: Thames Tideway Tunnel
The site is 115 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1252 m); London Strategic Heat Main Project (at pre-application, 111 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
World heritage site 14 m away: Maritime Greenwich
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
7 listed buildings within 150 m
Nearest: The Manor House, Grade II, 45 m away · 7 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 7 with distances
Historic England ↗
Also on the record
Scheduled monument 189 m away: Greenwich Palace; Radon affected area, class 2; Inside the Greenwich built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square; Town centre 47 m away: East Greenwich.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 22 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Submission of Details 8 Weeks
Postcode
SE10 9LT
Received
3 Nov 2025
Validated
18 Nov 2025
Ward
EAST GREENWICH
Parish
Greenwich
Case officer
Show
Target decision
13 Jan 2026
Decision
Approve
Decision date
13 Jan 2026
Decision level
Delegation
Applicant
Show
Agent
aava

How this decision compares

Decided in 56 days from validation, 11 days slower than Greenwich's median of 45 for amendments. Approved, as 80% of amendments here are.

71%decided within 8 weeks
80%approved
90decided in the last year

Plota live figures for amendments decided by Greenwich in the last twelve months, from validation. Greenwich decision record →

Public comments

No public comments yet.

Last counted 16 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14459476
Planning Portal ref
PP-14459476
Consultation
20 Nov 2025
Comments by
17 Dec 2025
Statutory expiry
13 Jan 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026