Whist House, Tannery Lane , Ashford, Kent. TN23 1PL Data via plota.co.uk

PA/2026/0965 - Listed building consent (Alt/Ext) Under Consultation

Proposal

Demolition of the curtilage listed Gun Shop and Long Shed buildings and internal and external repairs and alterations to the Grade II* listed Whist House including: • full roof and external tile hanging renewal; • the addition of insulation internally and within existing wall and roof cavities; • replacement of concrete floors and dilapidated timber floor areas at ground floor level with breathable limecrete, and the addition of a pamment floor and associated modifications to historic stair and panelling; • removal of failing render and the repair/restoration of brickwork, plinths and quoins; • repair and renewal of failed lath and plaster walls and ceilings; • joinery repairs and modifications as scheduled including upgrading and replacement of doors and windows; • reinstatement  of 2 no. misisng fire surrounds; • internal proprietary secondary glazing to windows as scheduled; • alterations to internal openings, partitions and the addition of glazed screens; • new tile hung and glazed lift addition to south elevation with 4 no. new associated new openings; • demolitions of west garden walls; • removal of modern external slabs and new brick plinths to existing columns where ground level reduced; • renewal of mechanical and electrical installations. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 May 2026
✓
Validated
19 Jun 2026
Decision
Target date was 14 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 131.

The consultation period closed on 23 Jul 2026.

Documents 183

Statements & assessments 39

PDF Statement Of Community Involvement Supporting Documents · 19 Jun 2026 View ↗ PDF Structural Survey - Whist House Supporting Documents · 17 Jun 2026 View ↗ PDF Financial Viability Assessment - TANL01-DHA-XX-XX-AS-PL-0001_36249 Supporting Documents · 15 Jun 2026 View ↗ PDF Heritage Impact Assessment Supporting Documents · 15 Jun 2026 View ↗ PDF Design and Access Statement - Part 5 Supporting Documents · 15 Jun 2026 View ↗ PDF Landscape Visual Assessment Supporting Documents · 29 May 2026 View ↗ PDF Assessment of Viewpoints Supporting Documents · 29 May 2026 View ↗ PDF Preliminary Ecological Appraisal Supporting Documents · 29 May 2026 View ↗ PDF Archaeological Desk-Based Assessment Part 2 Supporting Documents · 29 May 2026 View ↗ PDF BNG RCA Metric (Workbook Version).xlsx Supporting Documents · 29 May 2026 View ↗ PDF Structural Survey - Tanyard - Long Building Supporting Documents · 29 May 2026 View ↗ PDF Design and Access Statement PART 04. Supporting Documents · 29 May 2026 View ↗ PDF Ecological Work Letter Supporting Documents · 29 May 2026 View ↗ PDF Climate Mitigation Statement Supporting Documents · 29 May 2026 View ↗ PDF Biodiversity Net Gain and River Condition Assessment Supporting Documents · 29 May 2026 View ↗ PDF Flood Risk Assessment and Drainage Strategy - Part 1 Supporting Documents · 29 May 2026 View ↗ PDF Overheating Risk Assessment Supporting Documents · 29 May 2026 View ↗ PDF Asbestos Refurbishment Survey Supporting Documents · 29 May 2026 View ↗ PDF Structural Survey - Whist House - Figures 10 -52 Supporting Documents · 29 May 2026 View ↗ PDF Transport Assessment Supporting Documents · 29 May 2026 View ↗ PDF River Corridor Survey & River Condition Assessment Supporting Documents · 29 May 2026 View ↗ PDF Archaeological Desk-Based Assessment Appendix - Appendix 1: Proposed Development Plan Supporting Documents · 29 May 2026 View ↗ PDF BNG Pre Dev Condition Assessment metric Supporting Documents · 29 May 2026 View ↗ PDF Planning Statement Supporting Documents · 29 May 2026 View ↗ PDF Design and Access Statement - Part 3 Supporting Documents · 29 May 2026 View ↗ PDF Arboricultural Impact Assessment, Method Statement and Tree Protection Plan Supporting Documents · 29 May 2026 View ↗ PDF BNG - Post Dev Condition Assessments Supporting Documents · 29 May 2026 View ↗ PDF Bat Emergence Activity Survey Report Supporting Documents · 29 May 2026 View ↗ PDF Parking Survey Transport Technical Note Supporting Documents · 29 May 2026 View ↗ PDF Structural Survey - Tanyard – Gun Shop Supporting Documents · 29 May 2026 View ↗ PDF Archaeological Desk-Based Assessment - Part 1 Supporting Documents · 29 May 2026 View ↗ PDF Assessment for the Provisional Daylight and Sunlight Assessment Supporting Documents · 29 May 2026 View ↗ PDF Lighting Assessment Supporting Documents · 29 May 2026 View ↗ PDF Flood Risk Assessment and Drainage Strategy - Part 2 Supporting Documents · 29 May 2026 View ↗ PDF Noise Assessment Supporting Documents · 29 May 2026 View ↗ PDF Nutrient Neutrality Assessment and Mitigation Supporting Documents · 29 May 2026 View ↗ PDF Design and Access Statement - Part 2 Supporting Documents · 29 May 2026 View ↗ PDF Design and Access Statement - Part 1 Supporting Documents · 29 May 2026 View ↗ PDF Air Quality Assessment Supporting Documents · 29 May 2026 View ↗

Plans & drawings 114

PDF Existing Section Plan - 168895-FAH-XX-XX-DR-S-7001-P05 Plan · 23 Jun 2026 View ↗ PDF Proposed Section Plan - 168895-FAH-XX-XX-DR-S-7002-P05 Plan · 23 Jun 2026 View ↗ PDF Existing Elevations - Shed (adjacent to the Great Stour) - 2 Plan · 2 Jun 2026 View ↗ PDF SITE PLAN AS PROPOSED - WHSTPR01 Plan · 29 May 2026 View ↗ PDF PROPOSED _ FLOOR PLAN AND ROOF PLAN - WHPR03 Plan · 29 May 2026 View ↗ PDF SITE PLAN AS PROPOSED - WHSTPR01 Plan · 29 May 2026 View ↗ PDF Block B First Floor Plan - TANL01-ONA-BB-01-DR-A 0201 P02 Plan · 29 May 2026 View ↗ PDF Site Wide Combined External M&E Services Layout (Option 1) - TANL01-HAW-00-ZZ-DR-CS-6701 P02 Plan · 29 May 2026 View ↗ PDF Block D Section AA - TANL01-ONA-BD-SE-DR-A 0400 P01 Plan · 29 May 2026 View ↗ PDF Block A Fifth Floor Plan - TANL01-ONA-BA-05-DR-A 0205 P02 Plan · 29 May 2026 View ↗ PDF Drawing Issue Sheet - 260419 TANL01-ONA-ZZ-XX-SH-A-9000 Plan · 29 May 2026 View ↗ PDF Light Spill - SK-03 Plan · 29 May 2026 View ↗ PDF Block A Third Floor Plan - TANL01-ONA-BA-03-DR-A 0203 P02 Plan · 29 May 2026 View ↗ PDF Block B Sixth Floor Plan - P02 Plan · 29 May 2026 View ↗ PDF Block C Roof Plan - TANL01-ONA-BC-RO-DR-A 0207 P02 Plan · 29 May 2026 View ↗ PDF Block D West Elevation - P02 Plan · 29 May 2026 View ↗ PDF SITE PLAN A SPROPOSED - WHSTPR01 Plan · 29 May 2026 View ↗ PDF Block D Second Floor Plan - TANL01-ONA-BD-02-DR-A 0202 P02 Plan · 29 May 2026 View ↗ PDF Proposed Site Block Plan - TANL01-ONA-ZZ-XX-DR-A-0020 P02 Plan · 29 May 2026 View ↗ PDF SECTIONS 3 AND 4 AS PROPOSED - WHPR07 Plan · 29 May 2026 View ↗ PDF DRAWING REGISTER P3 - All Drawings ( As Existing, As Proposed, As Proposed with Demolition, demolition) Supporting Documents · 29 May 2026 View ↗ PDF Block C South Elevation - TANL01-ONA-BC-EL-DR-A 0302 P02 Plan · 29 May 2026 View ↗ PDF SITE PLAN AS EXISTING 1 - WHSTEX01 Plan · 29 May 2026 View ↗ PDF DEMOLITION FLOOR PLANS - WHDM02 Plan · 29 May 2026 View ↗ PDF Site Layout Plan First Floor Plan - TANL01-ONA-ZZ-01-DR-A 0101 P03 Plan · 29 May 2026 View ↗ PDF Block C Third Floor Plan - TANL01-ONA-BC-03-DR-A 0203 P02 Plan · 29 May 2026 View ↗ PDF Block A First Floor Plan - TANL01-ONA-BA-01-DR-A 0201 P02 Plan · 29 May 2026 View ↗ PDF SECTIONS 1 AND 2 AS PROPOSED - WHPR06 Plan · 29 May 2026 View ↗ PDF SECTIONS 5 AND 6 AS PROPOSED - WHPR08 Plan · 29 May 2026 View ↗ PDF DEMOLITION ELEVATIONS - WHDM05 Plan · 29 May 2026 View ↗ PDF Block C Section BB - TANL01-ONA-BC-SE-DR-A 0401 P01 Plan · 29 May 2026 View ↗ PDF Block C Fourth Floor Plan - TANL01-ONA-BC-04-DR-A 0204 P02 Plan · 29 May 2026 View ↗ PDF Block B West Elevation - TANL01-ONA-BB-EL-DR-A 0303 P03 Plan · 29 May 2026 View ↗ PDF Easement Plan - TANL01-ONA-ZZ-XX-DR-A-0030 P01 Plan · 29 May 2026 View ↗ PDF Site Location Plan - TANL01-ONA-ZZ-XX-DR-A 0001 P01 Plan · 29 May 2026 View ↗ PDF EXISTING ELEVATIONS 1 - WHEX04 Plan · 29 May 2026 View ↗ PDF EXISTING SECTIONS 3 AND 4 - WHEX07 Plan · 29 May 2026 View ↗ PDF Block B Fifth Floor Plan - TANL01-ONA-BB-05-DR-A 0205 P02 Plan · 29 May 2026 View ↗ PDF DEMOLITION ELEVATIONS - WHDM04 Plan · 29 May 2026 View ↗ PDF ELEVATIONS AS PROPOSED - WHPR05 Plan · 29 May 2026 View ↗ PDF Block B Second Floor Plan - TANL01-ONA-BB-02-DR-A 0202 P02 Plan · 29 May 2026 View ↗ PDF Block D South Elevation - TANL01-ONA-BD-EL-DR-A 0302 P02 Plan · 29 May 2026 View ↗ PDF Block B Third Floor Plan - TANL01-ONA-BB-03-DR-A 0203 P02 Plan · 29 May 2026 View ↗ PDF Existing Site Block Plan - TANL01-ONA-ZZ-XX-DR-A 0010 P02 Plan · 29 May 2026 View ↗ PDF Block B Roof Plan - TANL01-ONA-BB-RO-DR-A 0207 P02 Plan · 29 May 2026 View ↗ PDF Block C Second Floor Plan - TANL01-ONA-BC-02-DR-A - 0202 P02 Plan · 29 May 2026 View ↗ PDF Block C East Elevation - TANL01-ONA-BC-EL-DR-A 0301 P02 Plan · 29 May 2026 View ↗ PDF Landscape Masterplan Part 4 Plan · 29 May 2026 View ↗ PDF Block D Ground Floor Plan - TANL01-ONA-BD-00-DR-A 0200 P02 Plan · 29 May 2026 View ↗ PDF Block D Section BB - TANL01-ONA-BD-SE-DR-A - 0401 P01 Plan · 29 May 2026 View ↗ PDF Block B East Elevation - TANL01-ONA-BB-EL-DR-A 0301 P02 Plan · 29 May 2026 View ↗ PDF DEMOLITION FLOOR PLAN AND ROOF PLAN - WHDM03 Plan · 29 May 2026 View ↗ PDF Block C Section AA - TANL01-ONA-BC-SE-DR-A 0400 P01 Plan · 29 May 2026 View ↗ PDF Site Layout Plan Roof Plan - TANL01-ONA-ZZ-RO-DR-A 0107 P03 Plan · 29 May 2026 View ↗ PDF ELEVATIONS AS PROPOSED - WHPR04 Plan · 29 May 2026 View ↗ PDF ELEVATIONS AS PROPOSED (WITH DEMO) - WHPR04 Plan · 29 May 2026 View ↗ PDF Block C Ground Floor Plan - TANL01-ONA-BC-00-DR-A 0200 P02 Plan · 29 May 2026 View ↗ PDF Block B North Elevation - TANL01-ONA-BB-EL-DR-A - 0300 P03 Plan · 29 May 2026 View ↗ PDF Block C Fifth Floor Plan - TANL01-ONA-BC-05-DR-A 0205 P02 Plan · 29 May 2026 View ↗ PDF Block A East Elevation - TANL01-ONA-BA-EL-DR-A 0301 P02 Plan · 29 May 2026 View ↗ PDF Block A Sixth Floor Plan - TANL01-ONA-BA-06-DR-A 0206 P02 Plan · 29 May 2026 View ↗ PDF SECTIONS 5 AND 6 AS PROPOSED (WITH DEMO) WHPR08 Plan · 29 May 2026 View ↗ PDF Block B Section BB - TANL01-ONA-BB-SE-DR-A 0401 P01 Plan · 29 May 2026 View ↗ PDF Block A Fourth Floor Plan - TANL01-ONA-BA-04-DR-A 0204 P02 Plan · 29 May 2026 View ↗ PDF SECTIONS 1 AND 2 AS EXISTING1 - WHEX06 Plan · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A3 P2 Plan · 29 May 2026 View ↗ PDF DEMOLITION FLOOR PLAN - WHDM01 Plan · 29 May 2026 View ↗ PDF Block C West Elevation - TANL01-ONA-BC-EL-DR-A 0303 P02 Plan · 29 May 2026 View ↗ PDF Block B South Elevation - TANL01-ONA-BB-EL-DR-A 0302 P02 Plan · 29 May 2026 View ↗ PDF Assessed Scheme of Lighting - SK-02 Plan · 29 May 2026 View ↗ PDF Block B Fourth Floor Plan - TANL01-ONA-BB-04-DR-A 0204 P02 Plan · 29 May 2026 View ↗ PDF Block A Roof Plan - TANL01-ONA-BA-RO-DR-A 0207 P02 Plan · 29 May 2026 View ↗ PDF SECTIONS 3 AND 4 AS PROPOSED - WHPR07 Plan · 29 May 2026 View ↗ PDF Block A South Elevation - TANL01-ONA-BA-EL-DR-A 0302 P02 Plan · 29 May 2026 View ↗ PDF Block C Sixth Floor Plan - TANL01-ONA-BC-06-DR-A 0206 P02 Plan · 29 May 2026 View ↗ PDF Block D First Floor Plan - TANL01-ONA-BD-01-DR-A 0201 P02 Plan · 29 May 2026 View ↗ PDF Block D North Elevation - TANL01-ONA-BD-EL-DR-A 0300 P02 Plan · 29 May 2026 View ↗ PDF FLOOR PLANS AS EXISTING - WHEX01 Plan · 29 May 2026 View ↗ PDF FLOOR PLAN AS PROPOSED - WHPR01 Plan · 29 May 2026 View ↗ PDF Residential Receptor Location Plan - SK-01 Plan · 29 May 2026 View ↗ PDF Block A Section AA - TANL01-ONA-BA-SE-DR-A 0400 P01 Plan · 29 May 2026 View ↗ PDF ELEVATIONS AS PROPOSED - WHPR05 Plan · 29 May 2026 View ↗ PDF Interim Travel Plan Supporting Documents · 29 May 2026 View ↗ PDF Block A West Elevation - TANL01-ONA-BA-EL-DR-A 0303 P02 Plan · 29 May 2026 View ↗ PDF Site Layout Plan Ground Floor Plan - TANL01-ONA-ZZ-00-DR-A 0100 P04 Plan · 29 May 2026 View ↗ PDF FLOOR PLANS AS PROPOSED - WHPR02 Plan · 29 May 2026 View ↗ PDF Block D Roof Plan - TANL01-ONA-BD-RO-DR-A 0207 P02 Plan · 29 May 2026 View ↗ PDF Block B Section AA - TANL01-ONA-BB-SE-DR-A 0400 P01 Plan · 29 May 2026 View ↗ PDF Block D Fourth Floor Plan - TANL01-ONA-BD-04-DR-A 0204 P02 Plan · 29 May 2026 View ↗ PDF Block C First Floor Plan - TANL01-ONA-BC-01-DR-A 0201 P02 Plan · 29 May 2026 View ↗ PDF Block D Fifth Floor Plan - TANL01-ONA-BD-05-DR-A 0205 P02 Plan · 29 May 2026 View ↗ PDF Landscape Strategy Plan · 29 May 2026 View ↗ PDF FLOOR PLANS AS EXISTING - WHEX02 Plan · 29 May 2026 View ↗ PDF FLOOR PLAN AS PROPOSED (WITH DEMO) - WHPR01 Plan · 29 May 2026 View ↗ PDF FLOOR PLAN AND ROOF PLAN AS PROPOSED (WITH DEMO) - WHPR03 Plan · 29 May 2026 View ↗ PDF Landscape Masterplan - Part 3 Plan · 29 May 2026 View ↗ PDF Site Layout Plan Second Floor Plan - TANL01-ONA-ZZ-02-DR-A 0102 P02 Plan · 29 May 2026 View ↗ PDF Block A Second Floor Plan - TANL01-ONA-BA-02-DR-A 0202 P02 Plan · 29 May 2026 View ↗ PDF SECTIONS 1 AND 2 AS PROPOSED (WITH DEMO) - WHPR06 Plan · 29 May 2026 View ↗ PDF Block C North Elevation - TANL01-ONA-BC-EL-DR-A 0300 P02 Plan · 29 May 2026 View ↗ PDF DRAWING ISSUE SHEETS REV 00 - TANL01-HAW-XX-XX-SH-Z-0001 Supporting Documents · 29 May 2026 View ↗ PDF ELEVATIONS AS EXISTING 2 - WHEX05 Plan · 29 May 2026 View ↗ PDF Block B Ground Floor Plan - TANL01-ONA-BB-00-DR-A 0200 P02 Plan · 29 May 2026 View ↗ PDF Block A Ground Floor Plan - TANL01-ONA-BA-00-DR-A 0200 P02 Plan · 29 May 2026 View ↗ PDF FLOOR PLANS AS PROPOSED (WITH DEMO) - WHPR02 Plan · 29 May 2026 View ↗ PDF Block A Section BB - TANL01-ONA-BA-SE-DR-A 0401 P02 Plan · 29 May 2026 View ↗ PDF FLOOR PLAN AND ROOF PLAN AS EXISTING - WHEX03 Plan · 29 May 2026 View ↗ PDF Block A North Elevation - TANL01-ONA-BA-EL-DR-A 0300 P02 Plan · 29 May 2026 View ↗ PDF Block D Third Floor Plan - TANL01-ONA-BD-03-DR-A 0203 P02 Plan · 29 May 2026 View ↗ PDF Block D East Elevation TANL01-ONA-BD-EL-DR-A 0301 P02 Plan · 29 May 2026 View ↗ PDF Block D Sixth Floor Plan - TANL01-ONA-BD-06-DR-A 0206 P02 Plan · 29 May 2026 View ↗ PDF SECTIONS 5 AND 6 AS EXISTING - WHEX08 Plan · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P1 Plan · 29 May 2026 View ↗ PDF Elevations - Former Shop (fire damaged) - 1 Plan · 29 Apr 2026 View ↗

Consultation & comments 1

PDF Supporter’s name hidden Show Support Comment · 30 Jul 2026 View ↗

Other documents 28

PDF Advert - Press Notification Other · 26 Jun 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P4 Supporting Documents · 29 May 2026 View ↗ PDF Landscape Masterplan Part 1 Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A 3 Site Sensitivity Maps Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P3 Supporting Documents · 29 May 2026 View ↗ PDF Mechanical and Electrical Building Services Stage 2 Report Supporting Documents · 29 May 2026 View ↗ PDF Landscape and Visual Appraisal opt_S5-S6.pdf Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P2 Supporting Documents · 29 May 2026 View ↗ PDF Landscape and Visual Appraisal opt_S7.pdf Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - APPENDIX A Supporting Documents · 29 May 2026 View ↗ PDF Landscape and Visual Appraisal opt_S8 part2.pdf Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix B 1 Photographs Supporting Documents · 29 May 2026 View ↗ PDF Whist House Schedule of Repair and Intervention Works Rev P3 Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A4 P5 Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL Supporting Documents · 29 May 2026 View ↗ PDF Fire Safety Strategy Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P2 Supporting Documents · 29 May 2026 View ↗ PDF Full Appendix (1) Supporting Documents · 29 May 2026 View ↗ PDF Landscape Masterplan - Part 2 Supporting Documents · 29 May 2026 View ↗ PDF Landscape and Visual Appraisal opt_S8 part 1 Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL- Appendix A4 P6 Supporting Documents · 29 May 2026 View ↗ PDF Landscape and Visual Appraisal opt_S3.pdf Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P4 Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P3 Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL FIGURES Supporting Documents · 29 May 2026 View ↗ PDF PHASE 1 GEOENVIRONMENTAL DESK STUDY REPORT FINAL - Appendix A2 P1 Supporting Documents · 29 May 2026 View ↗ PDF Pre- Application Advice 2025 (22/01/2025) Supporting Documents · 22 Jan 2025 View ↗ PDF Pre-Application advice 2024 (08/01/2025) Supporting Documents · 8 Jan 2025 View ↗

All documents on the council site ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Stodmarsh SAC/SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Local nature reserve about 41 m away: Ashford Green Corridors
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Radon affected area, class 2; 1 listed building within 150 m of the postcode pin; Inside the Ashford (Ashford) built-up area; Flood defence about 49 m from the postcode pin (natural high ground, designed for a 1 in 25 year flood).
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ashford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ashford
Application type
Listed building consent (Alt/Ext)
Postcode
TN23 1PL
Received
29 May 2026
Validated
19 Jun 2026
Ward
Victoria
Parish
Central Ashford
Case officer
Show
Target decision
14 Aug 2026
Decision level
Pending
Applicant
Show
Agent
Emma Hawkes

Decision outlook

Day 131, past the statutory target. 43% of listed building consent in Ashford are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 27 Oct 2026.

Day 13175 days past the 56-day target
16%decided within 8 weeks
79%approved
86decided in the last year

Plota live figures for listed building consent decided by Ashford in the last twelve months, from validation. Ashford decision record →

Public comments

2comments received
1 objecting1 supporting

Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
23 Jul 2026
Ashford
Planning Authority Score
5.9/10
Average
#105 of 296 councils
Relevant to this application:
Other decisions

Ashford is faster than most councils at deciding householder applications, ranking #75 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Ashford decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #147 of 296
92%
Householder approved
Above avg (90%) #146 of 296
75%
Decided in 8 weeks
Above avg (63%) #75 of 296
40%
Extended time limit
Below avg (41%) #146 of 296
71%
Minor dwellings approved
106 decided (1-9 homes)
89%
Major dwellings approved
18 decided (10+ homes)
90%
Change of use approved
40 decided
991
Total decisions
123 refused in the year to March 2026