Old Thatched Cottage Stones Green Road Tendring Clacton On Sea Essex CO16 0DD Data via plota.co.uk

26/01290/FULHH - HH Application for Planning Permission Awaiting decision

Proposal

Householder Planning Application - Erection of 4 bay cart lodge (following removal of existing outbuilding). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
✓
Validated
24 Aug 2026
Decision
Expected by 5 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 6 Nov 2026, from Tendring's recent commercial and major works.

Site constraints 2

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 401 m away: North Falls Offshore Wind Farm
The site is 401 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Five Estuaries Offshore Wind Farm (decided, 403 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £330,000 in July 2011. Detached house, freehold.

22 July 2011£330,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area177 m² (1,905 sq ft)
Energy ratingF (25 out of 100), could reach B
PropertyDetached house, 6 habitable rooms
BuiltBefore 1900
HeatingRoom heaters, electric
WallsTimber frame, as built, no insulation (assumed)

From the energy performance certificate lodged in March 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Tendring - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Tendring
Application type
HH Application for Planning Permission
Postcode
CO16 0DD
Received
17 Aug 2026
Validated
24 Aug 2026
Ward
The Oakleys & Wix
Parish
Wix Parish Council
Case officer
Show
Target decision
5 Nov 2026
Applicant
Show

Decision outlook

Day 74, past the statutory target. 65% of commercial and major works in Tendring are decided within thirteen weeks, which runs to 23 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 4 Nov 2026.

Day 7418 days past the 56-day target
43%decided within 8 weeks
84%approved
18%go to committee

Plota live figures for commercial and major works decided by Tendring in the last twelve months, from validation. Tendring decision record →

Public comments

No public comments yet.

Last counted 4 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
19 Oct 2026
Env. assessment
No
Tendring
Planning Authority Score
6.8/10
Good
#70 of 296 councils
Relevant to this application:
Householder decisions

Tendring is faster than most councils at deciding householder applications, ranking #40 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tendring decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #212 of 296
89%
Householder approved
Below avg (90%) #211 of 296
80%
Decided in 8 weeks
Above avg (63%) #40 of 296
26%
Extended time limit
Below avg (41%) #38 of 296
71%
Minor dwellings approved
114 decided (1-9 homes)
88%
Major dwellings approved
16 decided (10+ homes)
80%
Change of use approved
49 decided
837
Total decisions
127 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.