Storage Land Adj Unit 2 Robert Harvey Way Tharston Norfolk Data via plota.co.uk

2025/3717 - Full Approved

Proposal

Proposed MOT testing bay and revisions to internal layout within the existing approved industrial unit (ref ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Nov 2025
✓
Consultation
8 Dec 2025
✓
Approved
13 Jan 2026

Approved on 13 Jan 2026 · Delegated · Last checked 8 Oct 2026

Associated applications 2

  • FullApproved2025/3717This application
    Proposed MOT testing bay and revisions to internal layout within the existing approved industrial unit
  • FullApprovedcouncil archive

Site constraints 4

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 780 m away: East Pye Solar
The site is 780 m from the project boundary. Generating station, under examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Long Stratton built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
NR15 2FD
Received
30 Nov 2025
Validated
30 Nov 2025
Ward
Forncett
Parish
Tharston And Hapton
Case officer
Show
Target decision
25 Jan 2026
Decision
Approval with Conditions
Decision date
13 Jan 2026
Decision level
Delegated
Applicant
Show
Agent
Howe and Boosey Architectural Services ltd

How this decision compares

Decided in 44 days from validation, 56 days faster than South Norfolk Broadland's median of 100 for full applications. Approved, as 86% of full applications here are.

22%decided within 8 weeks
86%approved
10%go to committee

Plota live figures for full applications decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

1comment received
1 supporting

14 neighbours consulted · Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14519632
Planning Portal ref
PP-14519632
Neighbours
8 Dec 2025
Consultation
8 Dec 2025
Comments by
11 Jan 2026
Site or press notice
18 Dec 2025
Statutory expiry
25 Jan 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Householder decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026