PA/25/02089/S - Non-material amendment (TCPA S96a) Approved

Proposal

Application for non-material amendment to prior approval ref:, dated 10/12/2024 Non-Material Amendment(s) Sought: - Relocation of cycle storage provision from ground floor entrance lobby to basement ensure clear escape routes. Cycle parking open 24 hours a day, secure and step free route to residential units, provision is as the original application. - Internal layout adjustments to Flats 1 to 5:Flat 1 Previous application (2B 3P) - 64msq Revised proposal (2B 3P) - 73msq Flat 2 Previous application (1B 1P) - 37msq Revised proposal (1B 1P) - 47msq and Flat 2 altered from studio to 1B 1p flat Flat 3 Previous application (1B 1P) - 43msq Revised proposal (1B 1P) - 46msq Flat 4 Previous application (1B 2P) - 50msq Revised proposal (1B 2P) - 52msq Flat 5 Previous application (2B 3P) - 78msq Revised proposal (2B 3P) - 71msq - Replacement of 2 existing windows- Installation of 1no additional window. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Feb 2026
✓
Approved
9 Mar 2026

Approved on 9 Mar 2026 · Delegated · Last checked 6 Jul 2026

Associated applications 3

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 430 m away: Thames Tideway Tunnel
The site is about 430 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, about 1152 m); London Strategic Heat Main Project (at pre-application, about 1551 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Local nature reserve about 265 m away: Mudchute Park Farm
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-material amendment (TCPA S96a)
Postcode
E14 9QD
Received
9 Feb 2026
Validated
9 Feb 2026
Ward
Blackwall and Cubitt Town
Case officer
Show
Target decision
9 Mar 2026
Decision
Permit
Decision date
9 Mar 2026
Decision level
Delegated
Applicant
Show
Agent
Whittaker Parsons Ltd
Leaseholder
Show

Consultation & key dates

Statutory expiry
9 Mar 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.