25/01703/NONMAT - Non-Material Amendment following Grant of Planning Permission Assessment

Proposal

Non- material amendment to planning permission dated 31/12/2019 comprising amendments to the approved parameter plans to accommodate the proposed reserved matters development sought under Gascoigne West Phase 3 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Nov 2025
✓
Validated
2 Dec 2025
Decision
Target date was 30 Dec 2025

Under consideration

No decision has been issued yet. A decision is expected by 30 Dec 2025.

Associated applications 5

Site constraints 11

Article 4 direction
HMO Article 4. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Barking and Dagenham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 1170 m away: Thames Tideway Tunnel; Scheduled monument 236 m away: Barking Abbey; Inside the Barking and Dagenham built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Conservation area 94 m away: Abbey Road and Riverside Conservation Area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Barking and Dagenham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment following Grant of Planning Permission
Received
28 Nov 2025
Validated
2 Dec 2025
Ward
Gascoigne
Case officer
Show
Target decision
30 Dec 2025
Applicant
Show
Agent
BE First Regeneration Ltd

Consultation & key dates

Statutory expiry
30 Dec 2025
Barking and Dagenham
Planning Authority Score
6.4/10
Average
#81 of 296 councils
Relevant to this application:
Householder decisions

Barking and Dagenham is one of the fastest councils in England for householder decisions, ranking #9 out of 296. Only 16% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Barking and Dagenham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 68% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Barking and Dagenham decision statistics
Based on MHCLG data, the year to March 2026
64%
Overall approval rate
Below avg (87%) #296 of 296
68%
Householder approved
Below avg (90%) #296 of 296
93%
Decided in 8 weeks
Above avg (63%) #9 of 296
16%
Extended time limit
Below avg (41%) #13 of 296
43%
Minor dwellings approved
86 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
28%
Change of use approved
80 decided
725
Total decisions