Land South Of Mulberry Way Belvedere Kent DA17 6AN Data via plota.co.uk

25/01657/FULM01 - Details pursuant to Planning Condition Approved

Proposal

Application to approve details of condition 5 (Archaeology WSI - Part A and B) pursuant to application 25/01657/FULM for the construction of a multi-storey van storage deck with electric vehicle (EV) charging with associated parking, ancillary structures and related works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 May 2026
✓
Consultation
8 Jul 2026
✓
Approved
8 Jul 2026

Approved on 8 Jul 2026 · Delegated · Last checked 11 Jul 2026

Associated applications 4

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Bexley AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 145 m away: Riverside Energy Park
The site is 145 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Cory Decarbonisation Project (decided, 767 m); London Strategic Heat Main Project (at pre-application, 824 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Bexley built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square; Flood defence 39 m away (natural high ground, designed for a 1 in 25 year flood).
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bexley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bexley
Application type
Details pursuant to Planning Condition
Postcode
DA17 6AN
Received
14 May 2026
Validated
14 May 2026
Ward
BELVEDERE
Case officer
Show
Target decision
9 Jul 2026
Decision
Details approved
Decision date
8 Jul 2026
Decision level
Delegated
Agent
CBRE Planning & Development Team

Consultation & key dates

Alt. reference
PP-14912728
Planning Portal ref
PP-14912728
Consultation
8 Jul 2026
Comments by
9 Jun 2026
Statutory expiry
9 Jul 2026
Env. assessment
No
Bexley
Planning Authority Score
8.9/10
Excellent
#5 of 296 councils
Relevant to this application:
Householder decisions

Bexley is one of the fastest councils in England for householder decisions, ranking #17 out of 296. Only 20% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bexley decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #106 of 296
95%
Householder approved
Above avg (90%) #69 of 296
89%
Decided in 8 weeks
Above avg (63%) #17 of 296
20%
Extended time limit
Below avg (41%) #17 of 296
69%
Minor dwellings approved
124 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
58%
Change of use approved
90 decided
1,324
Total decisions
133 refused in the year to March 2026