North Eastern Lands (Plots NE04, NE05 and NE06) - Land bound by Engineers Way to the south and Fulton Road to… Data via plota.co.uk

26/1247 - Conditions pursuant to a full permission Approved

Proposal

Details pursuant to Conditions 18 (surface water drainage) and 20 (delivery and servicing management plan) of Full Planning Permission reference: 25/3070, dated 12th February 2026, for Temporary use of land for meanwhile land uses comprising of; an outdoor sports facility (Use Class F2) to provide 5 no. 5-a-side floodlit all weather football pitches with a single storey pavilion building and an ancillary support area; a temporary building for use as a leisure, entertainment and events venue with storage buildings and external plant equipment in an ancillary support area; boundary treatment; shared informal public realm (with new seating, lighting and CCTV) along with provision for cycle parking, accessible car parking, and an internal vehicular access route with vehicular drop off. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 May 2026
✓
Approved
13 Jul 2026

Approved on 13 Jul 2026 · Delegated Team Manager · Last checked 17 Jul 2026

Associated applications 3

Site constraints 5

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Brent built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Conditions pursuant to a full permission
Postcode
HA9
Received
18 May 2026
Validated
18 May 2026
Ward
Wembley Park
Case officer
Show
Target decision
13 Jul 2026
Decision
Permission Granted
Decision date
13 Jul 2026
Decision level
Delegated Team Manager
Agent
CarneySweeney Planning

Consultation & key dates

Alt. reference
PP-14925033
Planning Portal ref
PP-14925033
Comments by
10 Jun 2026
Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026