Land at Teesport, Grangetown Data via plota.co.uk

R/2026/0279/NM - Non-material amendment Approved

Proposal

Non-material amendment to outline planning permission to amend Condition 3 to refer to the revised parameters plan and worded as follows:- 'The development hereby permitted shall not be carried out other than substantially in accordance with Parameter Plans No PC7517-HAS-XX-XX-D-ME- and PC7517-HAS-XX-XX-D-ME-. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Apr 2026
✓
Approved
17 Aug 2026

Approved on 17 Aug 2026 · Last checked 14 Sept 2026

Site constraints 9

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Filey Brigg to Newport Bridge across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area about 79 m away: Teesmouth and Cleveland Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project about 128 m away: Lighthouse Green Fuels Project
The site is about 128 m from the project boundary. Generating station, application submitted. Also within 2 km: The Net Zero Teesside Project (decided, about 312 m); York Potash Harbour Facilities Order (decided, about 375 m); East Coast Hydrogen Teesside Pipeline (at pre-application, about 147 m); H2NorthEast (H2NE) (at pre-application, about 298 m); H2Teesside (withdrawn, about 415 m); Lighthouse Green Fuels Project (DISCONTINUED) (withdrawn, about 1025 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
SSSI about 79 m away: Teesmouth and Cleveland Coast SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Tees Estuary Recovering Nature (TERN); Inside the Grangetown built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Redcar and Cleveland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-material amendment
Received
23 Apr 2026
Validated
23 Apr 2026
Case officer
Show
Decision
NON MATERIAL AMENDMENT APPROVE
Decision date
17 Aug 2026
Applicant
Show
Agent
ELG Planning
Redcar and Cleveland
Planning Authority Score
6.8/10
Good
#69 of 296 councils
Relevant to this application:
Householder decisions

Redcar and Cleveland ranks #169 out of 296 councils for householder decision speed. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Rarely extends deadlines
decisions usually arrive on time
These figures are council-wide context, not a prediction for this application. View full council performance
Redcar and Cleveland decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #15 of 296
96%
Householder approved
Above avg (90%) #58 of 296
62%
Decided in 8 weeks
Below avg (63%) #169 of 296
30%
Extended time limit
Below avg (41%) #56 of 296
78%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
95%
Change of use approved
37 decided
418
Total decisions
16 refused in the year to March 2026