101 Smyth Road Bristol BS3 2DR Data via plota.co.uk

26/11603/HX - Prior Notification - House extension Approved

Proposal

Notification of Prior Approval for the erection of a single storey rear extension that would exceed beyond the rear wall of the original house by 5 metres, have a maximum height of 4 metres and have eaves that are 3 metres high. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Apr 2026
✓
Validated
23 Apr 2026
✓
Approved
3 Jun 2026

Approved on 3 Jun 2026 · Delegated Decision · Last checked 6 Jul 2026

Site constraints 5

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
National infrastructure project 198 m away: Portishead Branch Line - MetroWest Phase 1
The site is 198 m from the project boundary. Railway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Inside the Bristol built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £564,000 in April 2026. Semi-detached house, freehold.

7 April 2026£564,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area129 m² (1,389 sq ft)
Energy ratingD (61 out of 100), could reach C
PropertySemi-detached house, 6 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in January 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Bristol - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bristol
Application type
Prior Notification - House extension
Postcode
BS3 2DR
Received
15 Apr 2026
Validated
23 Apr 2026
Ward
Bedminster
Parish
Greater Bedminster Community Partnership
Target decision
4 Jun 2026
Decision
Prior Approval NOT REQUIRED
Decision date
3 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
We Are Not Architects

How this decision compares

Decided in 41 days from validation, 8 days faster than Bristol's median of 49 for extensions. Approved, as 86% of extensions here are.

78%decided within 8 weeks
86%approved
1,213decided in the last year

Plota live figures for extensions decided by Bristol in the last twelve months, from validation. Bristol decision record →

Consultation & key dates

Alt. reference
PP-14844859
Planning Portal ref
PP-14844859
Comments by
20 May 2026
Statutory expiry
4 Jun 2026
Bristol
Planning Authority Score
5.8/10
Average
#109 of 296 councils
Relevant to this application:
Householder decisions

Bristol ranks #112 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Bristol decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #190 of 296
92%
Householder approved
Above avg (90%) #149 of 296
71%
Decided in 8 weeks
Above avg (63%) #112 of 296
37%
Extended time limit
Below avg (41%) #118 of 296
74%
Minor dwellings approved
374 decided (1-9 homes)
93%
Major dwellings approved
30 decided (10+ homes)
82%
Change of use approved
150 decided
2,098
Total decisions
293 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.