The Gate Burton Energy Park Project Data via plota.co.uk

WL/2026/00604 - NSIP (Gate Burton) Requirement Discharge Approved

Proposal

Request for confirmation of compliance with requirement 4 (Community Liaison Group) of The Gate Burton Energy Park Order 2024 (SI ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Jun 2026
✓
Validated
6 Jul 2026
✓
Approved
15 Oct 2026

Approved on 15 Oct 2026 · Delegated · Last checked 15 Oct 2026

Site constraints 3

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 147 m away: Gate Burton Energy Park
The site is about 147 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: West Burton Solar Project (decided, about 920 m); Cottam Solar Project (decided, about 920 m); Steeple Renewables Project (awaiting the Secretary of State's decision, about 939 m); Tillbridge Solar Project (decided, about 1302 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
2 listed buildings within 150 m of the postcode pin.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
NSIP (Gate Burton) Requirement Discharge
Postcode
DN21 5BA
Received
11 Jun 2026
Validated
6 Jul 2026
Case officer
Show
Target decision
14 Sept 2026
Decision
Condition discharged
Decision date
15 Oct 2026
Decision level
Delegated
Applicant
Show

Public comments

2comments received

Last counted 15 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
EC/2026/00567
Consultation
7 Jul 2026
Comments by
21 Jul 2026
Committee
16 Jun 2026
Statutory expiry
14 Sept 2026
Env. assessment
No
West Lindsey
Planning Authority Score
5.3/10
Average
#134 of 296 councils
Relevant to this application:
Householder decisions

West Lindsey ranks #110 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
West Lindsey decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #70 of 296
94%
Householder approved
Above avg (90%) #123 of 296
72%
Decided in 8 weeks
Above avg (63%) #110 of 296
44%
Extended time limit
Above avg (41%) #187 of 296
88%
Minor dwellings approved
80 decided (1-9 homes)
100%
Major dwellings approved
25 decided (10+ homes)
94%
Change of use approved
33 decided
562
Total decisions
39 refused in the year to March 2026