Summary of planning committee decision

Decided by Peak District Planning Committee on 13 Feb 2026.

NP/HPK/1125/1140Approved

What was proposed

The application proposed a 405-square-metre, single-storey infill extension linking two existing industrial buildings.

“The proposed development represents a modest infill between two existing buildings on an existing industrial site. It has been concluded that the proposed development, individually or cumulatively with what has already been approved, would not detrimentally impact the valued landscape character, residential amenity, highway safety or contribute towards increased flood risk locally.”

“The application proposes to extend a small link between the two existing industrial buildings on site to create a single-storey infill between the two structures. The proposed infill extension would have a floorspace of 405sqm.”

Officer report

The site and surroundings

The manufacturing site lies east of Hope beside the railway, with nearby homes, a protected grassland site and flood risks.

“Carbolite Ltd occupies the application site which is in use as a manufacturing premises. The site is located approximately 0.8 km to the east of the settlement of Hope. Hope Railway Station is located adjacent to application site and the railway line runs along the northern boundary of the site.”

“The Hallam Barn Grasslands Site of Special Scientific Interest lies some 500m to the north east. The site is in Flood Zone 2 and the area of the proposed infill extension is in an area at medium risk of surface water flooding.”

Officer report

Earlier planning permission

A 2016 permission allowed a factory extension, car park, access arrangements, landscaping and lighting.

“2016: Proposed extension to existing factory building and new car park accessed from Station Road (through existing station car park), together with associated landscaping, surfaces and low-level bollard lighting along Station Road – Granted conditionally…”

Officer report

What members discussed

Members discussed retaining the current gate, vehicle access to the car park and pedestrian access from the car park to the premises.

“Some Members had driven passed the site the previous day.”

“The current gate and how this can be retained • Vehicular access to the car park and pedestrian access from the car park to the premises.”

Minutes

The decision

The committee voted to approve the application with the listed conditions, and the motion was carried.

“A motion to approve the application with the conditions outlined below, was moved, seconded, put to the vote and carried.”

“That the application be APPROVED subject to the following conditions:”

Minutes

Sources

  • Peak District Planning Committee minutes, 13 February 2026
  • Agenda and papers (council website)

Source: Plota analysis of Peak District's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Date
Friday 13 February 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Minutes
The council's minutes
Meeting
Agenda and papers (council website)
Application
The application (council website)

This committee's year

44 decisions in the 12 months to this meeting, 6 against officer advice.

Source: Plota analysis of the committee's minutes.

Every decision by this council's committees →