Solar and renewables in North Lincs

North Lincs received 28 renewable energy applications in the last 12 months, including 2 solar farms, 3 battery storage sites and 1 heat pump. All 14 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for North Lincs

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 8 of 8 applications
16 Oct 2026 Pending PA/2026/1186

Land south-east of Dawes Lane, Scunthorpe, DN15 6UH

Planning permission to construct and operate a micro battery storage box

North Lincs
7 Oct 2026 Pending PA/2026/988

Riddings Community Hub, Enderby Road, Scunthorpe, DN17 2JL

Application for determination of the requirement for prior approval for the installation of proposed 111 kWp solar PV system

Prior Approval pt14 clsJ Solar PV equipment North Lincs
29 Sept 2026 Pending PA/SCO/2026/1

Adlingfleet, SCUNTHORPE, DN17 4SB

EIA scoping request for the adlingfleet wind farm project

Scoping Opinion North Lincs
23 Sept 2026 Pending PA/2026/1041

Land approximately 650m east of East Halton

Planning permission to construct, install and operate a Battery Energy Storage System (BESS) with associated infrastructure

Full planning permission North Lincs
16 Sept 2026 Pending PA/2026/1026

land adjacent Lindisfarne, Wold Road, Barrow upon Humber, DN19 7BT

Planning permission to erect a ground mounted solar panel system consisting of two rows of eight panels

Full planning permission North Lincs
9 Sept 2026 Pending PA/2026/864

BJW Cranes Ltd, Second Avenue, Flixborough Industrial Estate, Flixborough, Scunthorpe, DN15 8SD

Planning permission to install two steel shipping containers containing biomass boiler with flue and wood fuel store

Full planning permission North Lincs
7 Sept 2026 Pending PA/2026/807

Land on Killingholme B Power Station and CLdn Ports Killingholme Terminal, DN40 3DZ

Planning permission for the construction and operation of a Carbon Capture Plant (CCP) to capture carbon dioxide (CO2) from the adjacent consented Com...

Full planning permission North Lincs
11 Aug 2026 Pending PA/2026/786

Redbourne Hall Workroom, Redbourne Park, Redbourne, Gainsborough, DN21 4JG

Planning permission to install 34 roof-mounted solar photovoltaic (PV) panels to south and east facing roof slopes of existing workroom building

Full planning permission North Lincs
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in North Lincs

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in North Lincs?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by North Lincs. You can also narrow the alert to a postcode, street, or drawn area.

We check North Lincs's planning portal daily. New solar & renewables applications appear here within a day of being published.