Solar and renewables in Enfield

Enfield received 50 renewable energy applications in the last 12 months, including 12 heat pumps. Of the 33 decided so far, 27 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Enfield

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 21 of 21 applications
13 Oct 2026 Application in Progress 26/04369/PRV

Unit 5 The Arena 1004 Mollison Avenue Enfield EN3 7NL

Installation of solar panels to roof.

Class J Renewables Enfield
12 Oct 2026 Application in Progress 26/04072/HOU

49 The Chine London N21 2EE

Single storey side/rear extension involving demolition/rebuild of existing garage, rear patio, replacement windows and front door, roof lights, rear r...

Householder Enfield
9 Oct 2026 Application in Progress 26/03927/FUL

Verge To The North West Of 29 Genotin Road Enfield EN1 2AG

Construction and operation of a micro energy storage project.

Full Enfield
8 Oct 2026 Application in Progress 26/04137/FUL

West Lodge Park Hotel Cockfosters Road Barnet EN4 0PY

Installation of a ground-mounted solar photovoltaic array with associated inverters and connection equipment within the grounds of West Lodge Park Hot...

Full Enfield
7 Oct 2026 Application in Progress 26/04139/FUL

2 Fairview Road Enfield EN2 8JD

Demolition of existing dwelling house and erection of 3 x new dwelling houses (Class C3), involving extension to existing crossover with 2 x additiona...

Full Enfield
15 Sept 2026 Approved 23 Oct 26/03716/PRV

Unit 3 The Arena 1004 Mollison Avenue Enfield EN3 7NL

Installation of solar panels to roof.

Class J Renewables Enfield
7 Sept 2026 Application in Progress 26/03820/HOU

10 Brayton Gardens Enfield EN2 7LL

Part single storey, part two storey rear and side extensions, front porch, front roof lights and rear PV Solar panels.

Householder Enfield
7 Sept 2026 Application in Progress 26/03801/PRV

Southgate College High Street London N14 5EG

Installation of 600no. solar photo voltaic panels to campus buildings.

Class J Renewables Enfield
4 Sept 2026 Approved 29 Sep 26/03551/CEA

32 Meadway London N14 6NL

Installation of two air source heat pump in rear garden.

Cert of Lawful Use/Operation - Proposed Enfield
4 Sept 2026 Application in Progress 26/03656/CEA

6 Fairlight House 32 Bycullah Road Enfield EN2 8PJ

Installation of air source heat pump on balcony.

Cert of Lawful Use/Operation - Proposed Enfield
1 Sept 2026 Approved 16 Oct 26/03494/PRV

Unit 8 The Arena 1004 Mollison Avenue Enfield EN3 7NL

Installation of solar panels to roof.

Class J Renewables Enfield
27 Aug 2026 Application in Progress 26/03348/FUL

Ground Floor 33 Main Avenue Enfield EN1 1DJ

Change of use from Use Class Sui Generis (food takeaway) to Use Class E (commercial, business and service), involving sub division of premises, new fr...

Full Enfield
25 Aug 2026 Approved 1 Oct 26/03590/PRV

Hazelwood Infant And Junior School Hazelwood Lane London N13 5HE

Installation of solar photo voltaic panels to roof of Maple Building.

Class J Renewables Enfield
24 Aug 2026 Application in Progress 26/03135/FUL

Oliver House 23 Windmill Hill Enfield EN2 7AB

Erection of a five-storey side extension above the existing car park, with creation of fifth-floor to accommodate 15 x residential units, including ex...

Full Enfield
21 Aug 2026 Awaiting decision 26/03305/CEA

64 Chase Court Gardens Enfield EN2 8DJ

Rear dormer with Juliette balcony, front roof lights and PV solar panels.

Cert of Lawful Use/Operation - Proposed Enfield
17 Aug 2026 Approved 22 Sep 26/03457/CND

55 Eversley Park Road London N21 1NR

Details submitted pursuant to reference 23/01590/FUL: energy performance certificate (10) in respect of redevelopment of site involving demolishment o...

Discharge Condition Enfield
14 Aug 2026 Refused 15 Oct 26/03340/FUL

Main Building 84 Silver Street Enfield EN1 3EP

Alterations to roof ridge tiles, replacement of existing roof light with larger roof light and installation of an air source heat pump.

Full Enfield
14 Aug 2026 Refused 15 Oct 26/03341/LBC

Main Building 84 Silver Street Enfield EN1 3EP

Alterations to roof ridge tiles, replacement of existing roof light with larger roof light and installation of an air source heat pump.

Listed Building Consent Enfield
11 Aug 2026 Application in Progress 26/03276/FUL

26 The Glen Enfield EN2 7BZ

Subdivision of the site and erection of a two-storey detached dwellinghouse with accommodation within the roof space, incorporating solar panels; alte...

Full Enfield
6 Aug 2026 Refused 1 Oct 26/03148/FUL

203 Brettenham Road London N18 2HF

Conversion of single family dwelling house into 2 self-contained flats, involving 6x solar panels to rear roof, changes to front fenestration, refuse ...

Full Enfield
5 Aug 2026 Application in Progress 26/03335/CND

79 Windmill Hill Enfield EN2 7AF

Details submitted pursuant to appeal reference APP/Q5300/W/20/3263151 (19/01044/FUL): hard/soft landscaping (6) and bird/bat boxes (12) in respect of ...

Discharge Condition Enfield
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Enfield

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Enfield?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Enfield. You can also narrow the alert to a postcode, street, or drawn area.

We check Enfield's planning portal daily. New solar & renewables applications appear here within a day of being published.